Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Powder House Pass Community Improvement District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Powder House Pass Community Improvement District
This project includes approx. 3,960.8 SY of asphalt pavement full depth reclamation; 563.9 TON of asphalt concrete pavement, type E1 (bottom lift); 451.2 TON of asphalt concrete pavement, type E2 (top lift); 388 TON of aggregate base course; 385 LF of erosion control wattles, 12" Dia; 169.9 SY of sawcut/remove concrete driveway; 146 CY of excavation and embankment; 169.9 SY of reinforced concrete driveway, 6"; see outside links for more details.
Posted Date
Apr 30, 2025
Due Date
Dec 18, 2025
Release: Apr 30, 2025
Powder House Pass Community Improvement District
Close: Dec 18, 2025
This project includes approx. 3,960.8 SY of asphalt pavement full depth reclamation; 563.9 TON of asphalt concrete pavement, type E1 (bottom lift); 451.2 TON of asphalt concrete pavement, type E2 (top lift); 388 TON of aggregate base course; 385 LF of erosion control wattles, 12" Dia; 169.9 SY of sawcut/remove concrete driveway; 146 CY of excavation and embankment; 169.9 SY of reinforced concrete driveway, 6"; see outside links for more details.
Powder House Pass Community Improvement District
The project generally consists of the following primary components: demolition of existing lift station, installation of new sewer lift station via open cut and sewer piping, remove and dispose of existing 8" sewer pipe, 1 EA of abandon existing valve vault in place, 1 EA of connect to existing manhole, 40 LF of furnish & install 8" PVC SS, 24 LF of furnish & install 4" PVC SS, furnish & install lift station wet well, valve vault, and appurtenances, and associated work as shown on the plans.
Posted Date
Sep 17, 2024
Due Date
Sep 27, 2024
Release: Sep 17, 2024
Powder House Pass Community Improvement District
Close: Sep 27, 2024
The project generally consists of the following primary components: demolition of existing lift station, installation of new sewer lift station via open cut and sewer piping, remove and dispose of existing 8" sewer pipe, 1 EA of abandon existing valve vault in place, 1 EA of connect to existing manhole, 40 LF of furnish & install 8" PVC SS, 24 LF of furnish & install 4" PVC SS, furnish & install lift station wet well, valve vault, and appurtenances, and associated work as shown on the plans.