Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Port Of Walla Walla
The work consist of approx 320 LF silt fence; 16,600 SY precast concrete pavement removal; 270 SY asphalt cold milling; 4,650 CY unclassified excavation; 495 SF yellow and white initial markings; 840 LF 12" RCP class v; 60 LF 8" DIP. See outside link.
Posted Date
Feb 3, 2026
Due Date
Mar 3, 2026
Release: Feb 3, 2026
Port Of Walla Walla
Close: Mar 3, 2026
The work consist of approx 320 LF silt fence; 16,600 SY precast concrete pavement removal; 270 SY asphalt cold milling; 4,650 CY unclassified excavation; 495 SF yellow and white initial markings; 840 LF 12" RCP class v; 60 LF 8" DIP. See outside link.
Port Of Walla Walla
Work consists of painting three sides of a steel building with approx 13,200 SF of paintable surface.
Posted Date
Jan 27, 2026
Due Date
Feb 19, 2026
Release: Jan 27, 2026
Port Of Walla Walla
Close: Feb 19, 2026
Work consists of painting three sides of a steel building with approx 13,200 SF of paintable surface.
Port Of Walla Walla
The Port of Walla Walla is soliciting bids to construct a new 500,000-gallon water reservoir, improve an existing 298,000-gallon reservoir, install a high-flow pump and associated piping/valves, perform yard piping, and complete electrical and controls work at the Burbank Business Park. The project also includes backfilling an existing evaporation pond, improving an infiltration swale, and connecting existing pressure tanks at the pumphouse to the distribution system.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Port Of Walla Walla
Close: Feb 12, 2026
The Port of Walla Walla is soliciting bids to construct a new 500,000-gallon water reservoir, improve an existing 298,000-gallon reservoir, install a high-flow pump and associated piping/valves, perform yard piping, and complete electrical and controls work at the Burbank Business Park. The project also includes backfilling an existing evaporation pond, improving an infiltration swale, and connecting existing pressure tanks at the pumphouse to the distribution system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Port Of Walla Walla
This Economic Development Plan for Walla Walla County aims to enhance economic health by retaining and creating living-wage jobs and fostering private sector capital investment. The plan is guided by six core elements: small business development, existing business retention and expansion, business recruitment, marketing and advertising, site and infrastructure development, economic profiling, and economic development advocacy. Its ultimate goal is to improve the economic well-being of families throughout the county.
This Economic Development Plan for Walla Walla County aims to enhance the economic health of the region by retaining and creating living wage jobs. The plan focuses on six core elements: Small Business Development, Existing Business Retention/Expansion, Business Recruitment, Marketing & Advertising, Site and Infrastructure Development, Economic Profiling, and Economic Development Advocacy. It outlines strategies to achieve these goals through various initiatives and collaborations with community partners, ultimately benefiting all communities within the county.
This document outlines the Public Involvement Plan for the Port of Walla Walla's Comprehensive Port Plan, which serves as a roadmap for the use and development of Port properties. The Comprehensive Port Plan aims to define the Port's mission, goals, objectives, and policies guiding activities, property transactions, and investment decisions, while also describing existing facilities and proposed improvements for economic development. The Public Involvement Plan details strategies for inter-jurisdictional collaboration, community involvement, and stakeholder engagement through public meetings, key informant surveys, web-based outreach, public comment periods, and targeted outreach to rural communities, ensuring broad input and consensus for the strategic plan.
This Comprehensive Port Plan for the Port of Walla Walla outlines the organization's long-term direction to enhance the economic vitality of Walla Walla County through job creation and retention. Its strategic pillars focus on increasing economic vitality by attracting and retaining businesses, maintaining an ample supply of land and buildings, strategically investing in infrastructure, and ensuring flexible real estate transactions. The plan also prioritizes efficient transportation linkages, increasing constituent knowledge, and promoting transparency, with the intended outcome of fostering economic growth and improving the quality of life in the region.
The meeting included discussions and actions on several key items. The commission discussed and authorized an amendment to the lease agreement with Refresco Beverages US, Inc. They also approved entering into a professional services agreement with JUB Engineers, Inc., for a comprehensive planning study at the Wallula Gap Business Park. Additionally, the commission accepted a bid for the Century Pipe Spur Track project and approved a budget for it. Other topics included a lease renewal with Bi-Kay Farms, Inc., a hangar lease agreement with Nelson Construction Corp., and the approval of minimum rate and charge guidelines for the airport in 2026. The Executive Director and staff also provided reports on various matters of Port business.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Port Of Walla Walla's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge