Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Port Of Port Angeles
Work includes approx. Site preparation and foundation for new pre-engineered metal hangar building; Procurement and erection of pre-engineered metal hangar building; Taxilane sitework, grading, and paving; Drainage improvements; Minor utility improvements; Taxilane pavement markings.
Posted Date
Feb 25, 2026
Due Date
Apr 8, 2026
Release: Feb 25, 2026
Port Of Port Angeles
Close: Apr 8, 2026
Work includes approx. Site preparation and foundation for new pre-engineered metal hangar building; Procurement and erection of pre-engineered metal hangar building; Taxilane sitework, grading, and paving; Drainage improvements; Minor utility improvements; Taxilane pavement markings.
AvailablePort Of Port Angeles
Project consists of site of approx. demolition; site grading and resurfacing; constructing a stormwater treatment facility; upgrading the existing cofferdam dock facility; constructing a concrete utilidor for storm and electric utilities; constructing a concrete log ramp apron; relocating the boom shack; installing a banding platform and conex and associated electrical service; adjusting existing features to finished grade; and associated temporary erosion and sediment controls. See outside link for more details.
Posted Date
Jan 8, 2026
Due Date
Feb 11, 2026
Release: Jan 8, 2026
Port Of Port Angeles
Close: Feb 11, 2026
Project consists of site of approx. demolition; site grading and resurfacing; constructing a stormwater treatment facility; upgrading the existing cofferdam dock facility; constructing a concrete utilidor for storm and electric utilities; constructing a concrete log ramp apron; relocating the boom shack; installing a banding platform and conex and associated electrical service; adjusting existing features to finished grade; and associated temporary erosion and sediment controls. See outside link for more details.
Port Of Port Angeles
Soliciting architectural and engineering services for the design and development of a 125,000 square foot composites manufacturing building.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Port Of Port Angeles
Close: Jan 30, 2026
Soliciting architectural and engineering services for the design and development of a 125,000 square foot composites manufacturing building.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Port Of Port Angeles
The meetings covered a range of operational and administrative topics. Key discussions included updates on the COVID-19 pandemic response, logo branding initiatives, and a broadband feasibility study. The board reviewed investment reports and provided a detailed presentation on the 2020 2nd quarter capital budget, noting adjustments in project costs for maintenance dredging, sewer extensions, and boat haven repairs. Additionally, the board considered a request for a letter of support for the PUD #1 of Clallam County broadband infrastructure grant application and discussed the community partner program and capital budget planning processes.
The meeting agenda included a 2020 budget presentation, an update on the Orion Insurance Company run-off settlement, and the Forks Timber Museum CPP grant. Key business items addressed the Airport Master Plan update, a professional service agreement with Century West, and the Shell settlement. Several resolutions were presented, focusing on the appointment of a Port Treasurer and Port Auditor, as well as establishing an investment policy and authorizing investment in the Local Government Investment Pool. The Board also planned for an executive session to discuss authorized legal or financial matters.
The commission held a work session featuring presentations from twelve entities regarding the 2019 Community Partner Program and discussed funding strategies for projects that support port facilities. The agenda included reports on an Opportunity Zone convening and the Pacific Marine Expo. The commission also reviewed operations such as marine terminal traffic, change orders, and marina occupancy rates. Additionally, the commission authorized the sale of an abandoned vessel through the adoption of Port resolution 18-1187 and re-established the incidental expense fund and advance travel expense account via Port resolution 18-1186.
The board meeting agenda included several items for discussion: an exit conference with the Washington State Auditor, a briefing on legislative priorities for 2023, and a discussion regarding airport rehabilitation. Additionally, the commission reviewed a lease agreement for Dash Air Shuttle, Inc. at Fairchild International Airport and discussed the setup of a utility development fee for sewer infrastructure at the airport.
The meeting covered future agenda items and scheduled subsequent commission meetings for the month of August. Key discussions included an upcoming event hosted by the Clallam County EDC regarding recent gubernatorial guidelines and an open discussion period, followed by an executive session.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Port Of Port Angeles's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database