Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Port of Miami
Work consists of furnishing all materials, labor, and equipment necessary to install four (4) ceiling fans. 1. Installation of supplemental structural steel spanning between existing precast joists to support four (4) new large ceiling fans. 2. Removal of the existing photocell located in panel R, including conductors, conduits, and accessories, back to the source. 3. Removal of four (4) existing exterior disconnects, including associated receptacles, conductors, conduits, and accessories, back to the source. 4. Removal of four (4) existing breakers in panel R feeding the exterior disconnects. 5. Removal of receptacles and breakers providing power to the existing conveyor in panel P3W, circuits 8, 10, and 12. 6. Removal of four (4) existing 208v, 3-phase, 5-wire receptacles; cap wires and install blank covers. 7. Patching of all holes left after removal of existing equipment.
Posted Date
Apr 3, 2026
Due Date
Jun 18, 2026
Release: Apr 3, 2026
Port of Miami
Close: Jun 18, 2026
Work consists of furnishing all materials, labor, and equipment necessary to install four (4) ceiling fans. 1. Installation of supplemental structural steel spanning between existing precast joists to support four (4) new large ceiling fans. 2. Removal of the existing photocell located in panel R, including conductors, conduits, and accessories, back to the source. 3. Removal of four (4) existing exterior disconnects, including associated receptacles, conductors, conduits, and accessories, back to the source. 4. Removal of four (4) existing breakers in panel R feeding the exterior disconnects. 5. Removal of receptacles and breakers providing power to the existing conveyor in panel P3W, circuits 8, 10, and 12. 6. Removal of four (4) existing 208v, 3-phase, 5-wire receptacles; cap wires and install blank covers. 7. Patching of all holes left after removal of existing equipment.
AvailablePort of Miami
Work consists of furnishing materials, labor, and equipment necessary for the construction of the following improvements: 1. Cast-in-place concrete slab between existing runways 1 and 2 2. Asphalt and concrete overlay at the east end of existing runway 1 3. Concrete overlay at the east end of existing runway 3 around the storm bollard
Posted Date
Feb 25, 2026
Due Date
Apr 2, 2026
Release: Feb 25, 2026
Port of Miami
Close: Apr 2, 2026
Work consists of furnishing materials, labor, and equipment necessary for the construction of the following improvements: 1. Cast-in-place concrete slab between existing runways 1 and 2 2. Asphalt and concrete overlay at the east end of existing runway 1 3. Concrete overlay at the east end of existing runway 3 around the storm bollard
Port of Miami
To perform a complete upgrade of the fire alarm system in parking garage.
Posted Date
Dec 11, 2025
Due Date
Jan 5, 2026
Release: Dec 11, 2025
Port of Miami
Close: Jan 5, 2026
To perform a complete upgrade of the fire alarm system in parking garage.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge