Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
Full-time equivalent employees.
Graduation rate percentage.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Pontotoc Technology Center
Construction of a pre-engineered metal building to be used as a new vocational training facility. Work includes cutting and filling site, to create a stable building pad, rework of site utilities (electrical and plumbing including installing a new lift station), rough and final grading, sodding, concrete footings, floor slab, and flat work, pre-engineered metal building structure, vinyl faced insulation, standing seam roofing, metal stud framed walls, gypsum board ceilings and walls, hollow metal door and window frames, wood doors, overhead coiling door, acoustic lay-in ceiling, batt insulation, millwork and countertops, painting, flooring, mechanical, electrical and plumbing, complete and ready for use.
Posted Date
Jun 3, 2026
Due Date
Jun 17, 2026
Release: Jun 3, 2026
Pontotoc Technology Center
Close: Jun 17, 2026
Construction of a pre-engineered metal building to be used as a new vocational training facility. Work includes cutting and filling site, to create a stable building pad, rework of site utilities (electrical and plumbing including installing a new lift station), rough and final grading, sodding, concrete footings, floor slab, and flat work, pre-engineered metal building structure, vinyl faced insulation, standing seam roofing, metal stud framed walls, gypsum board ceilings and walls, hollow metal door and window frames, wood doors, overhead coiling door, acoustic lay-in ceiling, batt insulation, millwork and countertops, painting, flooring, mechanical, electrical and plumbing, complete and ready for use.
AvailablePontotoc Technology Center
Construction of a new 15,000 SF structural steel building with a 1,050 SF ICF storm shelter. Including site work, utilities, concrete sidewalks, final grading, sodding, concrete foundation and slab, structural steel, standing seam metal roof, ICF storm shelter, brick veneer / EIFS / metal wall panels for the exterior finish materials, metal stud framed and gypsum board interior walls, suspended acoustical ceilings, aluminum storefront, hollow metal frames, wood doors, millwork, polished concrete, carpet, LVT, and hard tile, painting, fire alarm, sprinkler system, HVAC, plumbing, electrical and lighting systems complete and ready for use.
Posted Date
Oct 16, 2025
Due Date
Nov 20, 2025
Release: Oct 16, 2025
Pontotoc Technology Center
Close: Nov 20, 2025
Construction of a new 15,000 SF structural steel building with a 1,050 SF ICF storm shelter. Including site work, utilities, concrete sidewalks, final grading, sodding, concrete foundation and slab, structural steel, standing seam metal roof, ICF storm shelter, brick veneer / EIFS / metal wall panels for the exterior finish materials, metal stud framed and gypsum board interior walls, suspended acoustical ceilings, aluminum storefront, hollow metal frames, wood doors, millwork, polished concrete, carpet, LVT, and hard tile, painting, fire alarm, sprinkler system, HVAC, plumbing, electrical and lighting systems complete and ready for use.
Pontotoc Technology Center
Provide basic maintenance of internal connections (BMIC) and MIBS for new equipment licenses that include services such as software upgrades and patches, (including bug fixes and security patches), and online and telephone-based technical assistance and tools that are typically standard fixed priced offerings or manufacturer maintenance support services (MSS) are sometimes classified as managed internal broadband (MIBS) or basic maintenance of internal connections (BMIC) by USAC. MIBS and BMIC have been included in the 470 for new equipment requests for this purpose. See attached files.
Posted Date
Feb 3, 2025
Due Date
Mar 18, 2025
Release: Feb 3, 2025
Pontotoc Technology Center
Close: Mar 18, 2025
Provide basic maintenance of internal connections (BMIC) and MIBS for new equipment licenses that include services such as software upgrades and patches, (including bug fixes and security patches), and online and telephone-based technical assistance and tools that are typically standard fixed priced offerings or manufacturer maintenance support services (MSS) are sometimes classified as managed internal broadband (MIBS) or basic maintenance of internal connections (BMIC) by USAC. MIBS and BMIC have been included in the 470 for new equipment requests for this purpose. See attached files.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Pontotoc Technology Center
The agenda includes the presentation of the FY 2022-2023 Annual Audit, the Superintendent's report, action on requisitions exceeding $12,500.00, action on resignations, and action on an architect contract. An executive session will be held to discuss the employment of several key personnel: Service Industry Instructor; Director of Business & Industry Services; Director of Maintenance & Facilities; Communications & Marketing Coordinator; Director of Information Systems; Director of Finance; and Director of Instructional and Student Services. The board will take action on the Service Industry Instructor position and will vote to re-employ or consider reasons not to re-employ the other listed positions. Other agenda items include new business and board discussion.
The agenda includes an assistant treasurer's oath of office, a consent agenda covering various reports and routine items (treasurer's report, activity fund reports, transfers, surplus property, instructor matters, personnel appointments, fund transfers, copier contract, Lumatech contract, OSIG resolution, workers' compensation insurance), the superintendent's report, action on requisitions, resignations, approval of the superintendent as purchasing agent, stipend approval for staff, salary schedule approval, an executive session to discuss employment matters (science instructor, BIS administrative assistant, lineworker instructor), hiring decisions for these positions, board discussion, and new business.
The agenda includes the approval of the consent agenda (minutes, treasurer's report, activity fund reports, transfers, surplus property, instructors, encumbrances, change orders, financial software contract, and school calendar), superintendent's report, action on requisitions exceeding $12,500, action on resignations, action on the Electrical Lineman Program Coordinator/Instructor job description, an executive session to discuss the re-employment of several directors, a vote to re-employ or find reasons not to re-employ those directors, board discussion, and new business.
The agenda includes consideration of the treasurer's and activity fund reports, activity fund transfers, surplus property, instructor matters, and various contract approvals for the fiscal year 2025. Discussions will also cover temporary appropriations, the full-time programs student handbook, resignations, a donation to the Lineworker Program, and the re-employment of instructional, professional, and support personnel. The agenda also includes action items on part-time summer positions and the employment of instructors. An executive session is proposed to discuss personnel matters.
The agenda includes the approval of the consent agenda (minutes, treasurer's report, activity fund reports, transfers, surplus property, instructors, encumbrances, change orders, school calendar, OKTLE system contract, and financial software contract), superintendent's report with introduction to CWA Architect, action on requisitions, resignations, FY 2025 marketing plan, donation from Holcim, student sponsorships, and executive session to discuss employment of administrative assistant and re-employment of several directors. The meeting will also include action on employment of the Business and Industry Services Administrative Assistant and re-employment of several directors. Finally, there will be a board discussion and new business.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Pontotoc Technology Center's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge