Summary
Construction of a pre-engineered metal building to be used as a new vocational training facility. Work includes cutting and filling site, to create a stable building pad, rework of site utilities (electrical and plumbing including installing a new lift station), rough and final grading, sodding, concrete footings, floor slab, and flat work, pre-engineered metal building structure, vinyl faced insulation, standing seam roofing, metal stud framed walls, gypsum board ceilings and walls, hollow metal door and window frames, wood doors, overhead coiling door, acoustic lay-in ceiling, batt insulation, millwork and countertops, painting, flooring, mechanical, electrical and plumbing, complete and ready for use.