PHA Parking Lot Replacement RFP
Jul 31, 2026
Closes
Aug 19, 2026
Demolition of the existing asphalt wear layer at the south and north parking lots and potions of their existing drives per plans. Work to include storm sewer structures work at two central catch basins and 2" curb catch basins to raise to align with the new finished asphalt and/or new concrete curb sections. New parking and ADA striping, and post signage per state and local ordinances.