Sewer Collection System Rehabilitation for Plateau Utility District
Aug 5, 2026
Closes
Aug 27, 2026
Work includes approx 5,600 LF 8" host pipe with 8" HDPE (DIPS) DR 17 pipe burst 8" host pipe; 35 EA 8" new HDPE service reconnections; 1 EA 4' new manhole install; 140 VF manhole rehab; 200 LF 6" SDR 26 PVC service line; 250 SY 2" asphalt pavement repair.
