Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Pennsylvania State University Main Campus
Work consists of an interior renovation and office refresh of portions of the fourth floor, including suites 408, 409, 410, and a portion of suite 412, totaling approx 4,661 SF, includes selective demolition and reconfiguration of interior partitions to create new private offices, open office areas, conference rooms, and a kitchenette/break room; installation of new partitions, doors, finishes, casework, ceilings, lighting, flooring, and signage; and associated modifications to mechanical, electrical, plumbing, fire protection, lighting, and low-voltage systems to support the revised layouts. Existing HVAC equipment and utilities will be selectively demolished, relocated, or reused as indicated, with new distribution and controls provided as required.
Posted Date
May 20, 2026
Due Date
Jun 4, 2026
Release: May 20, 2026
Pennsylvania State University Main Campus
Close: Jun 4, 2026
Work consists of an interior renovation and office refresh of portions of the fourth floor, including suites 408, 409, 410, and a portion of suite 412, totaling approx 4,661 SF, includes selective demolition and reconfiguration of interior partitions to create new private offices, open office areas, conference rooms, and a kitchenette/break room; installation of new partitions, doors, finishes, casework, ceilings, lighting, flooring, and signage; and associated modifications to mechanical, electrical, plumbing, fire protection, lighting, and low-voltage systems to support the revised layouts. Existing HVAC equipment and utilities will be selectively demolished, relocated, or reused as indicated, with new distribution and controls provided as required.
AvailablePennsylvania State University Main Campus
Construct new classroom building.
Posted Date
-
Due Date
May 28, 2026
Release: -
Pennsylvania State University Main Campus
Close: May 28, 2026
Construct new classroom building.
AvailablePennsylvania State University Main Campus
Pavement rehabilitation and preservation of parking lots and roadways throughout campus.
Posted Date
-
Due Date
May 27, 2026
Release: -
Pennsylvania State University Main Campus
Close: May 27, 2026
Pavement rehabilitation and preservation of parking lots and roadways throughout campus.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If the need is truly unique/compatible-only and ≥ $25,000, complete the “PROCUREMENT SOLE SOURCE JUSTIFICATION FORM” with the end-user and submit to Central Procurement for approval.
Coops: If not sole source, buy through an existing cooperative (E&I, OMNIA Partners, Sourcewell). Validate in the PSU procurement portal and proceed under pre-negotiated terms.
Pennsylvania State University Main Campus, PA allows sole source with formal justification for purchases of $25,000 or more. Work directly with the end-user department to complete the “PROCUREMENT SOLE SOURCE JUSTIFICATION FORM,” explaining why the product is uniquely essential, meets critical specs, is compatible with existing equipment, or requires unique expertise.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge