Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Pea Ridge Water Utilities
Pea Ridge Water Utilities is soliciting sealed bids to rehabilitate the Easterling Lift Station, including pumps, controls, an FRP control building, and electrical upgrades. Contract documents can be examined by contacting the listed engineer or obtained from Southern Reprographics, and a 5% bid bond is required for submission. Bids must be delivered to Halff Associates' office and will be publicly opened on May 5, 2026, at 2:00 PM local time.
Posted Date
Apr 19, 2026
Due Date
May 5, 2026
Release: Apr 19, 2026
Pea Ridge Water Utilities
Close: May 5, 2026
Pea Ridge Water Utilities is soliciting sealed bids to rehabilitate the Easterling Lift Station, including pumps, controls, an FRP control building, and electrical upgrades. Contract documents can be examined by contacting the listed engineer or obtained from Southern Reprographics, and a 5% bid bond is required for submission. Bids must be delivered to Halff Associates' office and will be publicly opened on May 5, 2026, at 2:00 PM local time.
AvailablePea Ridge Water Utilities
Project consists of rehabilitating the hwy 72 elevated water storage tank, including: exterior surface preparation and re-surfacing, interior surface preparation and re-surfacing, replace / modify vents and hatches, installation of a tank roof handrail system, and an interior safety climb ladder system, concrete foundation clean, caulk and seal, and painting of a logo.
Posted Date
Mar 1, 2026
Due Date
Mar 17, 2026
Release: Mar 1, 2026
Pea Ridge Water Utilities
Close: Mar 17, 2026
Project consists of rehabilitating the hwy 72 elevated water storage tank, including: exterior surface preparation and re-surfacing, interior surface preparation and re-surfacing, replace / modify vents and hatches, installation of a tank roof handrail system, and an interior safety climb ladder system, concrete foundation clean, caulk and seal, and painting of a logo.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Pea Ridge Water Utilities's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database