Shelter Facility Preservation RFP
Posted
Nov 14, 2026
Nov 24, 2026
The project converts former office space into two crisis rooms and two shelter rooms and renovates two bathrooms. Contractors must price the same issued scope and comply with the attached federal labor requirements. Renovate former office space into two crisis rooms and two shelter rooms; renovate two shelter bathrooms. Follow the final room-by-room plans, dimensions, finish schedule and code requirements supplied by addendum. Selective demolition; replace two vanities; install wood base trim, joint sealants and waterproofing, LVP flooring, new acoustic ceiling tile systems, paint, mirrors, restroom toilets, sinks and valves, HVAC grilles and required duct changes, and replacement lighting, to the final specifications.
