Taxilane Connector Project RFP
Posted
Sep 24, 2026
Oct 27, 2026
Work inlcudes construction of the new taxilane connection from the existing nwcc aeronatics building apron to the existing runway and includes site clearing, site grading, reinforced concrete arch pipe, crushed stone base, asphalt pavement, loose rip rap, erosion and sedimentation control and other miscellaneous work.

