Work consist of 40 LF of provide jack and bore installation of 24" steel casing, including pits, trench safety systems, casing spacers, end seals, dewatering, 45 LF of install new 12" DI (hdss restained pipe) water pipeline within the 24" steel casing, 45 LF of construct new 4" DI water pipeline, including bedding, backfill, 10 LF of construct new 6" DI water pipeline, 1,763 LF of construct new 12" DI water pipeline, 11 LF of construct new 12" stl cmlc water pipeline, 3 EA of furnish and install 12" gate c150 valve with valve box, 2 EA of furnish and install 12" butterfly c150 valve with valve box. See attached file.