Oswego East Pool Locker Replacement RFP RFP SPECIFICATIONS
Posted
Nov 16, 2026
Dec 11, 2026
Supply and installation of Heavy‑Duty Ventilated (HDV) metal lockers for the Oswego East pool locker area per the provided specifications, including specified materials, hardware, finishes and GREENGUARD GOLD certification. Work includes fabrication, delivery, coordination, anchorage and installation to manufacturer standards, with specified construction details, accessories, two‑year warranty (materials and workmanship, finish excluded) and required certifications. Installation work is to be completed in the summer and bidders must provide insurance, references, vendor qualifications and other required documentation listed in the RFP.



