Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Oklahoma State University Institute Of Technology
Oklahoma State University Institute of Technology (OSUIT) is soliciting bids for the Reynolds Center Boiler Replacement project on its Okmulgee, Oklahoma campus. The contract requires complete demolition of the existing boiler system and supply and installation of two new gas-fired, 3 MM Btu/h condensing boilers along with all associated piping, pumps, controls, fire-stop sealing, and integration with the campus building-automation system. An optional pre-bid conference and site visit is scheduled for July 9, 2026, and award will be made to the lowest responsible bidder.
Posted Date
Jul 2, 2026
Due Date
Jul 27, 2026
Release: Jul 2, 2026
Oklahoma State University Institute Of Technology
Close: Jul 27, 2026
Oklahoma State University Institute of Technology (OSUIT) is soliciting bids for the Reynolds Center Boiler Replacement project on its Okmulgee, Oklahoma campus. The contract requires complete demolition of the existing boiler system and supply and installation of two new gas-fired, 3 MM Btu/h condensing boilers along with all associated piping, pumps, controls, fire-stop sealing, and integration with the campus building-automation system. An optional pre-bid conference and site visit is scheduled for July 9, 2026, and award will be made to the lowest responsible bidder.
AvailableOklahoma State University Institute Of Technology
Hall 2nd & 3rd floor restroom renovation.
Posted Date
Mar 5, 2025
Due Date
Mar 28, 2025
Release: Mar 5, 2025
Oklahoma State University Institute Of Technology
Close: Mar 28, 2025
Hall 2nd & 3rd floor restroom renovation.
Oklahoma State University Institute Of Technology
Building improvements.
Posted Date
Mar 5, 2025
Due Date
Mar 28, 2025
Release: Mar 5, 2025
Oklahoma State University Institute Of Technology
Close: Mar 28, 2025
Building improvements.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $35,000, use sole source.
Coops: If your product is on a cooperative accessible to OSU System, ask Purchasing to piggyback and submit as a pre-competed buy through OK Corral.
Entity: Oklahoma State University Institute Of Technology (OSUIT).
Use when the product is uniquely justified by: compatibility with existing equipment, specialized academic/research supplies, or emergency needs. Work with the end-user to build the business case and collaborate with the OSUIT Purchasing Office to draft the required sole source affidavit, ensuring it meets at least two justification criteria per OSU policy. For any contract over $35,000, be prepared for the justification to be presented for approval at an OSU Board of Regents meeting. Reserve this path for highly specialized or proprietary offerings.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Dean, Creative & Information Technologies
Assistant Director of Marketing and Communications
Assistant Vice President for Academic Affairs - Executive Dean
Premium
Access the largest public sector contact database
© 2026 Starbridge