Procure a Generator Circuit Breaker for CDL2 Project (Request for Proposal)
Posted
Oct 10, 2026
Nov 4, 2026
Furnishment of a 13.8 kV, 60 Hz and 8000 Amp Generator Circuit Breaker for CDL2 Project.
Track open bid opportunities, contracts, public meetings, and key contacts for Oklahoma Municipal Power Authority (OMPA).
Active opportunities open for bidding
Posted
Oct 10, 2026
Nov 4, 2026
Furnishment of a 13.8 kV, 60 Hz and 8000 Amp Generator Circuit Breaker for CDL2 Project.
Posted
Oct 8, 2026
Nov 4, 2026
The procurement is for the supply and installation of a generator circuit breaker at the Charles D. Lamb Energy Center. The listing’s AI overview describes a simple-cycle power project using one GE 7E-class combustion turbine generator designed to operate on pipeline natural gas. It says the project is intended to support grid stability through rapid load changes.
Key metrics and characteristics
City
The city where this buyer is located.
Edmond
County
The county where this buyer is located.
Oklahoma
Address
Physical address of this buyer.
2701 W. I-35 Frontage Rd.
Zip Code
Postal code for this buyer's location.
73013
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Board meetings and strategic plans from Oklahoma Municipal Power Authority (OMPA)
The Board of Directors engaged in strategic discussions during a Planning Retreat focused on long-term goals and industry challenges, including a site tour of the Charles D. Lamb Energy Center. Key actions included the appointment of a new board member, authorization of a loan for substation construction, and approval of hardware purchases for system upgrades. Additionally, the Board authorized mass communication system implementation, the extension of power sales agreements, and the purchase of replacement maintenance equipment. Financial reports were reviewed and approved, along with the Fiscal 2025 Audit.
The special meeting commenced with a safety minute regarding space heater safety. The primary discussion involved the consideration, discussion, and possible action on alternative bids from GE Vernova Gas Power Equipment & Services or Siemens Energy, Inc. for the provision of a combustion gas turbine for installation at the Charles D. Lamb Energy Center. Presentations were given by Sargent & Lundy representatives regarding the project, bids, and cost comparison. Discussion also covered estimated costs, ongoing costs, and Air Permits. A motion was made and seconded to recommend the selection of the General Electric Unit, conditional subject to final contract negotiations with terms acceptable to the General Manager and General Counsel. The meeting was subsequently adjourned.
Public-sector contacts connected to Oklahoma Municipal Power Authority (OMPA).
Native sync to Salesforce & HubSpot
Key discussions during the meeting included a safety minute detailing an employee injury at the plant requiring stitches and subsequent corrective actions, including addressing incorrect Personal Protective Equipment (PPE) usage. The consent agenda involved approval of previous meeting minutes and bills for payment, as well as ratification of an emergency work authorization for weld repairs at the Charles D. Lamb Energy Center. The Board accepted the October 2025 Financial and Work Order reports, noting unfavorable year-to-date variances driven by maintenance expenses at Redbud and McClain plants. Performance goals results for 2025 were reviewed and approved at 89%. A significant topic was the authorization for the General Manager to terminate the Unit Power Sales Agreement between GRDA and OMPA concerning GRDA Unit 2, based on anticipated high capital costs for an extension. Additionally, the Board approved a Distribution Troubleshooter Service Agreement for several municipalities and accepted a bid from Red Dirt Services for pole replacement in 2026. Updates were provided on Turbine Generator bids and a planned contract termination with ONETA, resulting in a $3 million savings over three years. The Compliance Report highlighted new NERC alerts regarding large loads like data centers, and the ERM report addressed Transmission Cost Increases.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Oklahoma Municipal Power Authority (OMPA) meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership