City of Oconto - Water Street Reconstruction Contract B-2026 RFP
Aug 5, 2026
Closes
Aug 19, 2026
The project consists of approximately 1,400 CY of excavation, 1,200 tons of base course, 840 LF of curb and gutter, and 550 tons of asphaltic pavement, ADA curb ramp warning fields, site landscaping, and erosion also ncludes installation of 180 LF of 12" Class IV reinforced concrete storm sewer pipe, 3 manholes (1–3' diameter, 2–4' diameter), and 4 drainage inlets (1–3' diameter, 3–2x3'); placement of 43 SF of yellow detectable warning fields (30 SF standard and 13 SF radial); execution of 1 LS of landscaping (including slope undercut, topsoil placement, seeding, fertilizing, and mulching); and installation of 600 LF of silt fence for temporary sediment control..