DESIGN BUILD Services for Drinking Water Distribution System Replacement Project (Request for Qualification)
Aug 14, 2026
Closes
Sep 22, 2026
Provide design-build services to replace all the drinking water distribution system components. The improvements include design, permitting, and construction to replace all the existing water distribution system piping, re-aligning the water mains along the existing roadways, installing new services, meters, fire hydrants, valves and appurtenances, and re-paving the existing roads. The approximate length of pipe is 10,000 feet of varying sizes from 6 inch to 8 inch with associated appurtenances, approximately 400 service connections, and approximately 26,000 square yards of new asphalt.