Main Street Streetscape Construction
Aug 25, 2026
Closes
Sep 22, 2026
Work includes approx 30 EA erosion control, inlet protection, fabric drop; 10,162 SY cold milling HMA surface; 1,294 SY 4" aggregate base 21AA limestone; 35,49 SF 4" sidewalk, concrete.
