Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
Full-time equivalent employees.
Graduation rate percentage.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Northwest Technology Center-Alva
1,054 Tons Super Pave Type S4 Asphalt; 2,108 Tons Super Pave Type S3 Asphalt; 1,412 Gal. Tack Coat; 2,353 Gal. Prime Coat; 2,212 CY of 8" Thick Aggregate Base Type A; 159 SY of 6" Thick Gravel Surface; 1 LS Erosion/Sediment Control Measures; 2,370 CY Unclassified Excavation; 1,690 CY Embankment; 213 CY P.C. Concrete Material & Placement (w Rebar);; 642 LF of 8" Integral Concrete Barrier Curb; 295 CY of 8" Thick Aggregate Base Type A; 886 Tons Super Pave Type S4 Asphalt; 1,772 Tons Super Pave Type S3 Asphalt; 1,186 Gal. Tack Coat; 1,976 Gal. Prime Coat; 1,893 CY of 8" Thick Aggregate Base; 1 Ea. Standard Manholes – 5-10 Feet Deep; 4 Ea. Standard Manholes – 10-15 Feet Deep; 1,390 LF of 12" Sewer Main – PVC SDR 26; 2.00 Ea of 12" Interconnection to Manhole; 2,416 LF of 12" Water Main – PVC C900 DR18;; 224 LF of 12" Water Main – PE SDR 11; 6 Ea of 12" Gate Valve and Box; 4 Ea PVC to PE Transitions; 2 Ea of 12" x 12" x 12" Tee; 6 Ea of 12” x 45° Bend; 2 Ea of 12" x 22.5° Bend; 1 Ea of 2”"Air/Vacuum Release Valve; 6 Ea Fire Hydrant Assembly; 1.00 Ea of 12" Interconnection; 326 LF of 15" Diameter HP Storm Pipe; 8 Ea of 15" Drainage Pipe End Section; 6,900 SY Solid Slab Sodding; 1 LS Hydrostatic Pressure Testing and Disinfection.
Posted Date
Jun 12, 2026
Due Date
Jul 14, 2026
Release: Jun 12, 2026
Northwest Technology Center-Alva
Close: Jul 14, 2026
1,054 Tons Super Pave Type S4 Asphalt; 2,108 Tons Super Pave Type S3 Asphalt; 1,412 Gal. Tack Coat; 2,353 Gal. Prime Coat; 2,212 CY of 8" Thick Aggregate Base Type A; 159 SY of 6" Thick Gravel Surface; 1 LS Erosion/Sediment Control Measures; 2,370 CY Unclassified Excavation; 1,690 CY Embankment; 213 CY P.C. Concrete Material & Placement (w Rebar);; 642 LF of 8" Integral Concrete Barrier Curb; 295 CY of 8" Thick Aggregate Base Type A; 886 Tons Super Pave Type S4 Asphalt; 1,772 Tons Super Pave Type S3 Asphalt; 1,186 Gal. Tack Coat; 1,976 Gal. Prime Coat; 1,893 CY of 8" Thick Aggregate Base; 1 Ea. Standard Manholes – 5-10 Feet Deep; 4 Ea. Standard Manholes – 10-15 Feet Deep; 1,390 LF of 12" Sewer Main – PVC SDR 26; 2.00 Ea of 12" Interconnection to Manhole; 2,416 LF of 12" Water Main – PVC C900 DR18;; 224 LF of 12" Water Main – PE SDR 11; 6 Ea of 12" Gate Valve and Box; 4 Ea PVC to PE Transitions; 2 Ea of 12" x 12" x 12" Tee; 6 Ea of 12” x 45° Bend; 2 Ea of 12" x 22.5° Bend; 1 Ea of 2”"Air/Vacuum Release Valve; 6 Ea Fire Hydrant Assembly; 1.00 Ea of 12" Interconnection; 326 LF of 15" Diameter HP Storm Pipe; 8 Ea of 15" Drainage Pipe End Section; 6,900 SY Solid Slab Sodding; 1 LS Hydrostatic Pressure Testing and Disinfection.
AvailableNorthwest Technology Center-Alva
Work consist of section A - waterlines and well waterline: 14,537 LF of 12" PVC c900 dr18 water main, 621 LF of 8" PVC c900 dr18 water main, 240 LF of bore and install 18" stl. Casing, 21 EA of 6" fire hydrants. Section B - water wells: offset water wells w/ building, interior piping, valves, and meter, 380 LF of 6" PVC c900 dr18 water main, plug existing water well, 8 EA of 12" interconnection, 8 EA of emergency generator with concrete pad. Section C - sanitary sewer system improvements: 8,640 LF of 12" PVC sdr 26 sanitary sewer pipe, 2,160 LF of 8" PVC sdr 26 sanitary sewer pipe. See attached file.
Posted Date
May 16, 2025
Due Date
Jun 17, 2025
Release: May 16, 2025
Northwest Technology Center-Alva
Close: Jun 17, 2025
Work consist of section A - waterlines and well waterline: 14,537 LF of 12" PVC c900 dr18 water main, 621 LF of 8" PVC c900 dr18 water main, 240 LF of bore and install 18" stl. Casing, 21 EA of 6" fire hydrants. Section B - water wells: offset water wells w/ building, interior piping, valves, and meter, 380 LF of 6" PVC c900 dr18 water main, plug existing water well, 8 EA of 12" interconnection, 8 EA of emergency generator with concrete pad. Section C - sanitary sewer system improvements: 8,640 LF of 12" PVC sdr 26 sanitary sewer pipe, 2,160 LF of 8" PVC sdr 26 sanitary sewer pipe. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Northwest Technology Center-Alva
This document outlines the strategic focuses for Northwest Technology Center, structured around key areas. It details initiatives for enhancing Full-Time Career Programs through student and parent engagement, academic progress, and skill development. It also covers growth and retention strategies for Workforce and Economic Development Services, emphasizing customer satisfaction. Further focuses include personnel development, strengthening stakeholder relationships through various outreach activities, and effective management of financial and innovative resources.
This Communications & Marketing Plan for Northwest Technology Center aims to strategically guide marketing activities to fulfill the institution's Mission and Vision. The plan outlines seven key marketing strategies focused on engaging employees, customers, and alumni; increasing daytime program enrollment; raising awareness for Adult Career Development and Business and Industry training; ensuring sending school staff are knowledgeable; and securing stakeholder support. These strategies align with the broader strategic goals of expanding stakeholder awareness, cultivating student success, enhancing organizational efficiency, empowering workforce members, and strengthening community/business relationships.
The strategic plan focuses on full-time career programs, business and industry services and organizational development. For full-time career programs, the plan emphasizes student and parent engagement, communication, grades, attendance, and program progress. For business and industry services, the plan focuses on growth opportunities, customer retention and growth, customer satisfaction, and customer engagement. For organizational development, the plan emphasizes personnel development and stakeholder development. The plan also covers management of resources and operations management.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Northwest Technology Center-Alva's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge