Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Northwest Bergen County Utility Authority
The Northwest Bergen County Utilities Authority seeks to pre-qualify firms to provide engineering, architectural, and land use services to support its operations, including design, planning, and land use analysis. The contract term is approximately two years from award with possible extensions and an estimated value range of $500,000–$2,000,000 (AI estimate). Proposers must comply with New Jersey EEO/affirmative action requirements and other state procurement conditions; submissions are accepted via the buyer’s Bonfire portal.
Posted Date
Apr 14, 2026
Due Date
May 1, 2026
Release: Apr 14, 2026
Northwest Bergen County Utility Authority
Close: May 1, 2026
The Northwest Bergen County Utilities Authority seeks to pre-qualify firms to provide engineering, architectural, and land use services to support its operations, including design, planning, and land use analysis. The contract term is approximately two years from award with possible extensions and an estimated value range of $500,000–$2,000,000 (AI estimate). Proposers must comply with New Jersey EEO/affirmative action requirements and other state procurement conditions; submissions are accepted via the buyer’s Bonfire portal.
Northwest Bergen County Utility Authority
The Bergen County Utilities Authority intends to participate in the TIPS-USA Co-op contract to procure Sewer and Pipeline Inspection, Assessment, and Related Services for a 60-inch sewer interceptor Multi-Sensor Inspection (MSI) Assessment. The estimated contract value is up to $209,340 and the selected contractor indicated is RedZone Robotics, Inc. The project involves a six-month contract period from the Notice to Proceed to conduct the specialized sewer assessment.
Posted Date
Mar 3, 2026
Due Date
Mar 17, 2026
Release: Mar 3, 2026
Northwest Bergen County Utility Authority
Close: Mar 17, 2026
The Bergen County Utilities Authority intends to participate in the TIPS-USA Co-op contract to procure Sewer and Pipeline Inspection, Assessment, and Related Services for a 60-inch sewer interceptor Multi-Sensor Inspection (MSI) Assessment. The estimated contract value is up to $209,340 and the selected contractor indicated is RedZone Robotics, Inc. The project involves a six-month contract period from the Notice to Proceed to conduct the specialized sewer assessment.
Northwest Bergen County Utility Authority
The Bergen County Utilities Authority seeks bids for restoration and mitigation of power supply and plant-wide systems at the Little Ferry Water Pollution Control Facility in Little Ferry, New Jersey. The work includes constructing flood walls and barriers, dry floodproofing openings, sealing penetrations, and elevating, replacing, and floodproofing major electrical components. It also covers related plant-wide improvements to pump buildings, sludge stations, grit and dewatering buildings, control and administrative buildings, pipe galleries, the lagoon pumping station, and the main switchyard/substations.
Posted Date
Dec 24, 2025
Due Date
Feb 25, 2026
Release: Dec 24, 2025
Northwest Bergen County Utility Authority
Close: Feb 25, 2026
The Bergen County Utilities Authority seeks bids for restoration and mitigation of power supply and plant-wide systems at the Little Ferry Water Pollution Control Facility in Little Ferry, New Jersey. The work includes constructing flood walls and barriers, dry floodproofing openings, sealing penetrations, and elevating, replacing, and floodproofing major electrical components. It also covers related plant-wide improvements to pump buildings, sludge stations, grit and dewatering buildings, control and administrative buildings, pipe galleries, the lagoon pumping station, and the main switchyard/substations.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Northwest Bergen County Utility Authority
The meeting and public hearing were convened to discuss and adopt the 2011 connection fee rate adjustment. The Board reviewed an auditor's report detailing the calculation of the connection fee based on net investment in the sanitary sewer collection and treatment system. It was determined that the calculated cost per service unit was $3,974, and the Board approved a resolution to implement a 50% reduction, setting the final connection fee at $1,987 per EDU. The testimony of experts in accounting and engineering was incorporated into the record to validate the methodology used in the report.
The board discussed and approved several resolutions including the retention of the Authority's auditor, consulting engineers, bond counsel, and general/labor counsel for 2011. Key actions included approving the regular employment status for two employees, authorizing the Authority to join the Sewage Sludge Incinerator Advocacy Coalition to appeal EPA regulations, and approving two sanitary sewer extensions in the Township of Mahwah. Committee reports covered facility operations, capacity and flow, incinerator rebuild updates, inter-municipal service charges, and financial investment strategies. Additionally, the board reviewed plans for website transparency enhancements and the 2010 annual report.
The board convened to discuss the 2023 Authority Budget. The discussion included an overview of the introduced budget, the financial impact of the increased State Health Benefits Program premiums, and efforts to control administrative costs while boosting revenue. The board officially passed Resolution No. 93-2022 regarding the 2023 Authority Budget for the fiscal year beginning January 1, 2023.
The board discussed professional services contracts, specifically focusing on the Request for Qualifications (RFQ) process for legal services and the need to align contract agreements with county requirements, such as establishing hourly rates rather than retainers. There was extensive discussion regarding the Franklin Lakes Project, including engineering services to be provided by T&M Associates and legal services by Douglas Bern, Esq. The board also reviewed the procedure for qualifying professional firms and explored potential shared services with other county agencies.
The board meeting included comprehensive updates from the treasurer, general counsel, consulting engineer, authority engineer, and executive director regarding various operational aspects. The board approved resolutions 30-2026 through 31-2026, which authorized the payment of vouchers, payroll, tax deposits, and benefits, and approved a sewer connection and extension for a property located in the Borough of Waldwick.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Northwest Bergen County Utility Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge