Incinerator Ash Pad RFP
Posted
Nov 10, 2026
Dec 8, 2026
The Project generally consists of the construction of a concrete wall and reconstruction of the concrete curb along the existing concrete pad to prevent uncontrolled contaminated stormwater runoff, and installation of a new stormwater conveyance system discharging to a new stormwater manhole with a sump bottom The Project also includes all other Work of any type or description necessary for completion of the Project, whether or not specifically described in these Contract Documents.