Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Northshore Utility District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
General Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Northshore Utility District
Approx. 950 LF of 6", 3,350 LF of 8", and 20 LF of 12" diameter restrained joint water main replacement and 8 connections to the existing water system. The work also includes replacement of 97 water services, 7 fire hydrants, 7 blowoff assemblies, and 1 air and vacuum relief valve (ARV) assembly. Existing water main and appurtenances shall be filled and abandoned in place. Restoration includes trench patching, asphalt grind & overlay, curb, sidewalk & 35 ADA ramp replacements.
Posted Date
Jan 23, 2026
Due Date
Feb 18, 2026
Release: Jan 23, 2026
Northshore Utility District
Close: Feb 18, 2026
Approx. 950 LF of 6", 3,350 LF of 8", and 20 LF of 12" diameter restrained joint water main replacement and 8 connections to the existing water system. The work also includes replacement of 97 water services, 7 fire hydrants, 7 blowoff assemblies, and 1 air and vacuum relief valve (ARV) assembly. Existing water main and appurtenances shall be filled and abandoned in place. Restoration includes trench patching, asphalt grind & overlay, curb, sidewalk & 35 ADA ramp replacements.
AvailableNorthshore Utility District
The project consists of the following work: Schedule A - 190/35 Water Main Replacement Schedule A consists of the installation of approx. 18 LF of 8" restrained joint ductile iron water main, 280 LF of 6" restrained joint ductile iron water main, the replacement of seven (7) 1" water services, one (1) 2" blowoff assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, and curb replacement. Schedule B - 190/60 Water Main Replacement: Schedule B consists of the installation of approx. 350 LF of 6" restrained joint ductile iron water main, the replacement of eleven (11) 1" water services, one (1) 2" blowoff and air-vac assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, and curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule C - 198/64 Water Main Replacement: Schedule C consists of the installation of approx. 260 LF of 6" restrained joint ductile iron water main, the replacement of seven (7) 1" water services, one (1) 2" blowoff assembly, appurtenances, and one connection to the existing system. Water main is replaced primarily within a private utility and access easement. Existing 2” water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule D - 145/104 Water Main Replacement: Schedule D consists of the installation of approx. 360 LF of 6" restrained joint ductile iron water main, the replacement of nineteen (19) 1" water services, three (3) 2" blowoff assemblies, appurtenances, and three connections to the existing system. Existing 2” water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule E - Juanita/88 Water Main Replacement: Schedule E consists of the installation of approx. 190 LF of 6" restrained joint ductile iron water main, the replacement of six (6) 1" water services, one (1) 2" blowoff assembly, one (1) fire hydrant assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay. Schedule F - 120/80 Water Main Replacement: Schedule F consists of the installation of approx. 475 LF of 8" restrained joint ductile iron water main, 365 LF of 6" restrained joint ductile iron water main, the replacement of twenty-four (24) 1" water services, three (3) 2" blowoff assemblies, one (1) fire hydrant assembly, appurtenances, and one (1) connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching and curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule G - 124/106 Water Main Replacement: Schedule G consists of the installation of approx. 675 LF of 8" restrained joint ductile iron water main, 105 LF of 6" restrained joint ductile iron water main, the replacement of sixteen (16) 1" water services, one (1) 2" blowoff assembly, one (1) fire hydrant assembly, appurtenances, and three (3) connection to the existing system. Existing AC water main and appurtenances shall be abandoned in place to the extent feasible. Restoration includes trench patching, asphalt grind and overlay, and curb and concrete replacement. In addition, all sewer manhole castings in overlay area will be replaced and three (3) ADA ramps will be installed.
Posted Date
Oct 6, 2025
Due Date
Oct 28, 2025
Release: Oct 6, 2025
Northshore Utility District
Close: Oct 28, 2025
The project consists of the following work: Schedule A - 190/35 Water Main Replacement Schedule A consists of the installation of approx. 18 LF of 8" restrained joint ductile iron water main, 280 LF of 6" restrained joint ductile iron water main, the replacement of seven (7) 1" water services, one (1) 2" blowoff assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, and curb replacement. Schedule B - 190/60 Water Main Replacement: Schedule B consists of the installation of approx. 350 LF of 6" restrained joint ductile iron water main, the replacement of eleven (11) 1" water services, one (1) 2" blowoff and air-vac assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, and curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule C - 198/64 Water Main Replacement: Schedule C consists of the installation of approx. 260 LF of 6" restrained joint ductile iron water main, the replacement of seven (7) 1" water services, one (1) 2" blowoff assembly, appurtenances, and one connection to the existing system. Water main is replaced primarily within a private utility and access easement. Existing 2” water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule D - 145/104 Water Main Replacement: Schedule D consists of the installation of approx. 360 LF of 6" restrained joint ductile iron water main, the replacement of nineteen (19) 1" water services, three (3) 2" blowoff assemblies, appurtenances, and three connections to the existing system. Existing 2” water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule E - Juanita/88 Water Main Replacement: Schedule E consists of the installation of approx. 190 LF of 6" restrained joint ductile iron water main, the replacement of six (6) 1" water services, one (1) 2" blowoff assembly, one (1) fire hydrant assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay. Schedule F - 120/80 Water Main Replacement: Schedule F consists of the installation of approx. 475 LF of 8" restrained joint ductile iron water main, 365 LF of 6" restrained joint ductile iron water main, the replacement of twenty-four (24) 1" water services, three (3) 2" blowoff assemblies, one (1) fire hydrant assembly, appurtenances, and one (1) connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching and curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule G - 124/106 Water Main Replacement: Schedule G consists of the installation of approx. 675 LF of 8" restrained joint ductile iron water main, 105 LF of 6" restrained joint ductile iron water main, the replacement of sixteen (16) 1" water services, one (1) 2" blowoff assembly, one (1) fire hydrant assembly, appurtenances, and three (3) connection to the existing system. Existing AC water main and appurtenances shall be abandoned in place to the extent feasible. Restoration includes trench patching, asphalt grind and overlay, and curb and concrete replacement. In addition, all sewer manhole castings in overlay area will be replaced and three (3) ADA ramps will be installed.
Northshore Utility District
Schedule A - Lakewood Villas Mobile Home Park water main replacement: Install approx. 500 LF of 8" DI water main to replace existing; install a new 4" water meter and meter vault; and replace 1-1/2" water meter. Schedule B - Plywood Supply Company side sewer modification and manhole installation: Provide bypass pumping; install new manhole; install 6" PVC sewer pipe to connect existing side sewer to new manhole; and restore asphalt. Schedule C (optional, pending final permit requirements) - Full-width asphalt planing and overlay of the park's main driveway.
Posted Date
Jul 14, 2025
Due Date
Aug 5, 2025
Release: Jul 14, 2025
Northshore Utility District
Close: Aug 5, 2025
Schedule A - Lakewood Villas Mobile Home Park water main replacement: Install approx. 500 LF of 8" DI water main to replace existing; install a new 4" water meter and meter vault; and replace 1-1/2" water meter. Schedule B - Plywood Supply Company side sewer modification and manhole installation: Provide bypass pumping; install new manhole; install 6" PVC sewer pipe to connect existing side sewer to new manhole; and restore asphalt. Schedule C (optional, pending final permit requirements) - Full-width asphalt planing and overlay of the park's main driveway.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.