CT1 Lodi Fuel Gas Bypass Line
Posted
Sep 8, 2026
Oct 23, 2026
Work consists of fabrication and installation of approx 60 LF of high pressure fuel gas piping to serve as a gas compressor bypass line. The bypass line installation will include pressure regulators, valves, drains, pipe supports, and concrete footers.

