North Wales Water Authority Pfas Treatment Systems for Well 31 (G-001) and Well 34 Gg-002)
Posted
Sep 8, 2026
Oct 8, 2026
Construction and installation of a new granular activated carbon adsorption/filtration system at two (2) existing well sites. The work also includes the construction of filter building, chlorination equipment, underground and aboveground piping, valves and fittings, an underground concrete backwash holding tank, and various site improvements with electrical installations.
