Constructing the Calloway Canal Lining: 7th Standard Road To 8-1 Canal
Aug 4, 2026
Closes
Sep 2, 2026
Work consists of constructing the calloway canal lining. Includes , modifying, re-shaping and constructing approx 6,700 LF of existing canal section extending from the existing lined canal section starting at the north side of 7th Standard Road at the end of the existing concrete lined section, running north to the existing weir structure adjacent to the 8-1 Canal, which includes subgrade preparation, relocation of fill dirt (if necessary), placement, compaction and grading of fill as well as approx 6,675 LF of concrete lining; (2) construction of a new 55 foot wide reinforced concrete Canal gate structure with Canal gates provided by the District.
