North Franklin Township Waterside Park Sports Court and Parking - Phase 1
Aug 18, 2026
Closes
Sep 8, 2026
Base Bid: Construction of Redi-Rock Retaining Wall; Utility Line Extensions; 9,975 SF Pickleball Court Surface to be built on a New Concrete Reinforced Slab; Fencing; Concrete Sidewalks; Light Posts; Electrical Pedestal Power Stations; Water Spigots; Benches; New 11,523 SF Asphalt Parking Lot; Striping and Stormwater Infrastructure. Add Alternate Bid: West Palm Street (Directly across the Roadway from Base Bid Project) 2.5" Depth Milling, Resurfacing and Replacement and New Asphalt Wedge Curb.
