Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
NGA Procurement Contracts
For continued support of facilities and operations, engineering, planning, interior design, and logistics services.
Posted Date
Feb 10, 2026
Due Date
Feb 20, 2026
Release: Feb 10, 2026
NGA Procurement Contracts
Close: Feb 20, 2026
For continued support of facilities and operations, engineering, planning, interior design, and logistics services.
AvailableNGA Procurement Contracts
Project consists of demolition of existing restrooms and construction of new single user toilet rooms, companion care / family restrooms, and a lactation room. Work also includes a new access door to adjacent art containing space, new accessible ramps and entrance to egress corridor, and a new security closet and janitor’s closet. There will be a new four (4)-pipe fan coil unit for the security closet. The project will also include a new automated sprinkler system throughout. On the Intermediate Basement Level (EB-I), work includes the replacement of an existing AHU with a new 8,000 cfm closed coil AHU in the same location. Note the requirements to provide temporary AHU to provide spaces outside of the area of work that would be affected by the outage. It also includes demolition of existing offices, studio, and photography space and construction of new AV offices and staging area / workshop, new Production Studio filming studio, control booth, sound recording booth, and workshop. Temporary Partitions, staging and phasing should consider public and staff access to egress and paths of circulation. On the Concourse Level, protection of existing artwork (located in 16A & B) should be maintained throughout construction. The SC-1 Corridor is an emergency egress path for the public. Access to EF-1 and Stair 5 should be maintained as much as possible, especially during public hours. The SC-1 Corridor is also heavily used by staff for back of house access. Access to CLA-151 & CLA-152 should be maintained throughout construction. CLA-154 can be used for construction staging. Uninterrupted operation of the East Building Shop (EC-1A) during public hours shall be accounted for. Access from Lift (LF-2) at the Loading dock to the areas of construction utilizes staff corridors: CLB-8, CLB-20, EBI-1, EBI-17, Ramp CLB-4A and Elevator EF-1. On the EBI level, access should be maintained for staff at surrounding EBI corridors as well as adjacent telecom and electrical closets. Please refer to Sheets G011, G012, G013 & G014 for further information. See outside link.
Posted Date
Jun 6, 2025
Due Date
Aug 7, 2025
Release: Jun 6, 2025
NGA Procurement Contracts
Close: Aug 7, 2025
Project consists of demolition of existing restrooms and construction of new single user toilet rooms, companion care / family restrooms, and a lactation room. Work also includes a new access door to adjacent art containing space, new accessible ramps and entrance to egress corridor, and a new security closet and janitor’s closet. There will be a new four (4)-pipe fan coil unit for the security closet. The project will also include a new automated sprinkler system throughout. On the Intermediate Basement Level (EB-I), work includes the replacement of an existing AHU with a new 8,000 cfm closed coil AHU in the same location. Note the requirements to provide temporary AHU to provide spaces outside of the area of work that would be affected by the outage. It also includes demolition of existing offices, studio, and photography space and construction of new AV offices and staging area / workshop, new Production Studio filming studio, control booth, sound recording booth, and workshop. Temporary Partitions, staging and phasing should consider public and staff access to egress and paths of circulation. On the Concourse Level, protection of existing artwork (located in 16A & B) should be maintained throughout construction. The SC-1 Corridor is an emergency egress path for the public. Access to EF-1 and Stair 5 should be maintained as much as possible, especially during public hours. The SC-1 Corridor is also heavily used by staff for back of house access. Access to CLA-151 & CLA-152 should be maintained throughout construction. CLA-154 can be used for construction staging. Uninterrupted operation of the East Building Shop (EC-1A) during public hours shall be accounted for. Access from Lift (LF-2) at the Loading dock to the areas of construction utilizes staff corridors: CLB-8, CLB-20, EBI-1, EBI-17, Ramp CLB-4A and Elevator EF-1. On the EBI level, access should be maintained for staff at surrounding EBI corridors as well as adjacent telecom and electrical closets. Please refer to Sheets G011, G012, G013 & G014 for further information. See outside link.
NGA Procurement Contracts
Transcription services requirements: YouTube, Zoom, MS Teams Connections; Post-Back captions to YouTube and other online services; Ability to download a variety of speech-to-text file types including but not limited to: DFXP; SCC; SRT; WEBVTT; Facebook SRT; SRT No Blanks; Work Doc; Time-Stamped Work Doc; PDF; Online tool for editing captions after submitted for transcription; Foreign Language Translations; Live Captioning for webinars; Transcription services must have a human pass; Options for varying time turnaround; Will keep past transcription jobs available online for future use and download; Allow multiple departments with separate funding sources.
Posted Date
Feb 3, 2025
Due Date
Feb 8, 2025
Release: Feb 3, 2025
NGA Procurement Contracts
Close: Feb 8, 2025
Transcription services requirements: YouTube, Zoom, MS Teams Connections; Post-Back captions to YouTube and other online services; Ability to download a variety of speech-to-text file types including but not limited to: DFXP; SCC; SRT; WEBVTT; Facebook SRT; SRT No Blanks; Work Doc; Time-Stamped Work Doc; PDF; Online tool for editing captions after submitted for transcription; Foreign Language Translations; Live Captioning for webinars; Transcription services must have a human pass; Options for varying time turnaround; Will keep past transcription jobs available online for future use and download; Allow multiple departments with separate funding sources.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track NGA Procurement Contracts's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across NGA Procurement Contracts's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database