Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across NEZ Perce-Clearwater National Forest's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
NEZ Perce-Clearwater National Forest
Work includes but is not limited to repair storm water runoff damage to the road surface and ditch, recondition the driving surface and drainage through road shaping and drainage relief on the roads. Road shall be reconditioned to its original standard. This includes watering, mixing, blading, shaping, and compaction of the processed material into a smooth non-segregated, shaped road surface. The work also includes installation, repair, and restoration of drivable dips. Cleaning of existing ditches, culvert inlets, and open top cross drains and removal and replacement of culverts.
Posted Date
Nov 1, 2023
Due Date
Nov 15, 2024
Release: Nov 1, 2023
NEZ Perce-Clearwater National Forest
Close: Nov 15, 2024
Work includes but is not limited to repair storm water runoff damage to the road surface and ditch, recondition the driving surface and drainage through road shaping and drainage relief on the roads. Road shall be reconditioned to its original standard. This includes watering, mixing, blading, shaping, and compaction of the processed material into a smooth non-segregated, shaped road surface. The work also includes installation, repair, and restoration of drivable dips. Cleaning of existing ditches, culvert inlets, and open top cross drains and removal and replacement of culverts.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.