Edwina and Lower Quarry Pump Station Improvements RFP
Jul 30, 2026
Closes
Sep 1, 2026
The Project includes upgrades to both the existing Edwina and Lower Quarry Pump Stations, along with placing a proposed 1,067 linear feet of 8-inch HDPE force main between the Edwina Pump Station and the Lower Quarry Pump Station. The proposed force main will be horizontal directional drilled underneath the Pigeon River with a 16” HDPE casing. The Edwina Pump Station existing firm capacity is approximately 150gpm while the Lower Quarry Pump Station existing firm capacity is approximately 975gpm.