Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
New Level Sports Ministries (NLSM)
Design, permit and construct the fire suppression system. See attached file.
Posted Date
Jul 22, 2026
Due Date
Aug 7, 2026
Release: Jul 22, 2026
New Level Sports Ministries (NLSM)
Close: Aug 7, 2026
Design, permit and construct the fire suppression system. See attached file.
AvailableNew Level Sports Ministries (NLSM)
The general scope of work for the new level sports renovation project includes: pavement demolition and grading for the expansion of the existing surface parking lot which includes improvements to paving, lot drainage, site lighting, outdoor landscaping. The completion of the site restoration work shall include the restoration of all areas disturbed by the construction work such as: Backfilling, all final lawn rough grading, finish fine grading of the lawn surfaces as specified in the preparation to install the hydro-seeding materials for lawn areas, the actual hydro-seeding and fertilization of the prepared approved turf lawn areas, protection of all fixed site improvements like fencing, trees, play structures, walk and other paved surfaces from any over-spray, clean-up following installation work, aeration, and fertilizing, and other maintenance and care necessary to produce a quality lawn including scarifying and re-application of any bare areas as required until the new turf is fully established.
Posted Date
Jul 22, 2026
Due Date
Aug 7, 2026
Release: Jul 22, 2026
New Level Sports Ministries (NLSM)
Close: Aug 7, 2026
The general scope of work for the new level sports renovation project includes: pavement demolition and grading for the expansion of the existing surface parking lot which includes improvements to paving, lot drainage, site lighting, outdoor landscaping. The completion of the site restoration work shall include the restoration of all areas disturbed by the construction work such as: Backfilling, all final lawn rough grading, finish fine grading of the lawn surfaces as specified in the preparation to install the hydro-seeding materials for lawn areas, the actual hydro-seeding and fertilization of the prepared approved turf lawn areas, protection of all fixed site improvements like fencing, trees, play structures, walk and other paved surfaces from any over-spray, clean-up following installation work, aeration, and fertilizing, and other maintenance and care necessary to produce a quality lawn including scarifying and re-application of any bare areas as required until the new turf is fully established.
AvailableNew Level Sports Ministries (NLSM)
Design, permit and construct the fire alarm system. See attached file.
Posted Date
Jul 22, 2026
Due Date
Aug 7, 2026
Release: Jul 22, 2026
New Level Sports Ministries (NLSM)
Close: Aug 7, 2026
Design, permit and construct the fire alarm system. See attached file.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge