Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
NCDAC-DECM
This project includes selective demolition, replacement of the existing low-sloped epdm roof system with a new two-ply modified bitumen membrane system and associated work at all roof areas including the gatehouse, main administrative areas, and dormitories at mountain view correctional institution.
Posted Date
Apr 5, 2026
Due Date
May 6, 2026
Release: Apr 5, 2026
NCDAC-DECM
Close: May 6, 2026
This project includes selective demolition, replacement of the existing low-sloped epdm roof system with a new two-ply modified bitumen membrane system and associated work at all roof areas including the gatehouse, main administrative areas, and dormitories at mountain view correctional institution.
AvailableNCDAC-DECM
Work includes construction of a new, non-lethal perimeter stun fence, new eis fence detection system, as well as associated site improvements including, but not limited to new perimeter security fence installation, existing perimeter security fence repair / reconfiguration, associated foundations and retaining walls, as well as architectural and electrical systems improvements to support the new systems.
Posted Date
Feb 7, 2026
Due Date
Apr 21, 2026
Release: Feb 7, 2026
NCDAC-DECM
Close: Apr 21, 2026
Work includes construction of a new, non-lethal perimeter stun fence, new eis fence detection system, as well as associated site improvements including, but not limited to new perimeter security fence installation, existing perimeter security fence repair / reconfiguration, associated foundations and retaining walls, as well as architectural and electrical systems improvements to support the new systems.
NCDAC-DECM
Work includes to replace the bas control system and components/device, six (6) vfd's, reinsulate all duct work, chilled water piping, heating hot water piping, steam and condensate piping, and domestic hot water piping in room b120.
Posted Date
Jan 16, 2026
Due Date
Mar 26, 2026
Release: Jan 16, 2026
NCDAC-DECM
Close: Mar 26, 2026
Work includes to replace the bas control system and components/device, six (6) vfd's, reinsulate all duct work, chilled water piping, heating hot water piping, steam and condensate piping, and domestic hot water piping in room b120.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track NCDAC-DECM's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database