Learn more →Work includes 1 LS ponds vegetation removal; 1 LS demolition of pond 1 and pond 2 appurtenances and sludge removal; 1 LS ponds 1 and pond 2 rehabilitation; 1 LS influent and effluent transfer piping and structures.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Work includes 1 LS ponds vegetation removal; 1 LS demolition of pond 1 and pond 2 appurtenances and sludge removal; 1 LS ponds 1 and pond 2 rehabilitation; 1 LS influent and effluent transfer piping and structures.
AvailableWork includes clearing and grubbing, vibration monitoring, demolish existing facilities, relocate mailbox, remove and replace ace and vine sign, remove and replace pet hospital sign, closure structure #1, #2, #3, inspection trench excavation and backfill, excavation, earthen backfill (f), floodwall - concrete t-wall footing (f), floodwall -concrete t-wall (f), floodwall - sheet pile wall (f), chain link fence (6 foot, 3 strand barbed wire, vinyl slats), wood and wire divider fence (6-ft), 3-ft pedestrian safety railing, 4-ft pedestrian safety railing, o&m chain link fence gate, wall street waterline modifications, wall street sewerline modifications, lincoln avenue waterline modifications.
Posted Date
Sep 30, 2025
Due Date
Jan 9, 2026
Release: Sep 30, 2025
Close: Jan 9, 2026
Work includes clearing and grubbing, vibration monitoring, demolish existing facilities, relocate mailbox, remove and replace ace and vine sign, remove and replace pet hospital sign, closure structure #1, #2, #3, inspection trench excavation and backfill, excavation, earthen backfill (f), floodwall - concrete t-wall footing (f), floodwall -concrete t-wall (f), floodwall - sheet pile wall (f), chain link fence (6 foot, 3 strand barbed wire, vinyl slats), wood and wire divider fence (6-ft), 3-ft pedestrian safety railing, 4-ft pedestrian safety railing, o&m chain link fence gate, wall street waterline modifications, wall street sewerline modifications, lincoln avenue waterline modifications.
AvailableThe project includes construction of concrete and sheet pile floodwalls, recreational trails, o&m roads, channel stabilization, and associated infrastructure for flood protection.
Posted Date
Sep 15, 2025
Due Date
Sep 29, 2025
Release: Sep 15, 2025
Close: Sep 29, 2025
The project includes construction of concrete and sheet pile floodwalls, recreational trails, o&m roads, channel stabilization, and associated infrastructure for flood protection.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis