Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes construction of concrete and sheet pile floodwalls, recreational trails, o&m roads, channel stabilization, and associated infrastructure for flood protection.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes clearing and grubbing, vibration monitoring, demolish existing facilities, relocate mailbox, remove and replace ace and vine sign, remove and replace pet hospital sign, closure structure #1, #2, #3, inspection trench excavation and backfill, excavation, earthen backfill (f), floodwall - concrete t-wall footing (f), floodwall -concrete t-wall (f), floodwall - sheet pile wall (f), chain link fence (6 foot, 3 strand barbed wire, vinyl slats), wood and wire divider fence (6-ft), 3-ft pedestrian safety railing, 4-ft pedestrian safety railing, o&m chain link fence gate, wall street waterline modifications, wall street sewerline modifications, lincoln avenue waterline modifications.
Posted Date
Sep 30, 2025
Due Date
Jan 9, 2026
Premium
Access the largest public sector contact database
Close: Jan 9, 2026
Work includes clearing and grubbing, vibration monitoring, demolish existing facilities, relocate mailbox, remove and replace ace and vine sign, remove and replace pet hospital sign, closure structure #1, #2, #3, inspection trench excavation and backfill, excavation, earthen backfill (f), floodwall - concrete t-wall footing (f), floodwall -concrete t-wall (f), floodwall - sheet pile wall (f), chain link fence (6 foot, 3 strand barbed wire, vinyl slats), wood and wire divider fence (6-ft), 3-ft pedestrian safety railing, 4-ft pedestrian safety railing, o&m chain link fence gate, wall street waterline modifications, wall street sewerline modifications, lincoln avenue waterline modifications.
AvailableThe U.S. Embassy in Ankara, Türkiye is seeking a contractor to provide elevator maintenance services, with all materials, labor, overhead and equipment included and payment upon satisfactory completion. This is a presolicitation notice: the government plans to issue the formal solicitation via SAM.gov (beta.SAM.gov) no earlier than 19 December 2025, and all responsible sources may submit an offer. The opportunity includes an attachment (Pre Solicitation Notice PDF) on SAM.gov and notes no paper copies will be mailed.
Posted Date
Dec 8, 2025
Due Date
Dec 19, 2025
Release: Dec 8, 2025
Close: Dec 19, 2025
The U.S. Embassy in Ankara, Türkiye is seeking a contractor to provide elevator maintenance services, with all materials, labor, overhead and equipment included and payment upon satisfactory completion. This is a presolicitation notice: the government plans to issue the formal solicitation via SAM.gov (beta.SAM.gov) no earlier than 19 December 2025, and all responsible sources may submit an offer. The opportunity includes an attachment (Pre Solicitation Notice PDF) on SAM.gov and notes no paper copies will be mailed.
AvailableThe Oregon Department of Transportation is seeking a Technology Consultant to assist with system engineering and to advise the agency on functionality and operation of a Commercial Vehicle Registration (CVR) system. The posting is listed as a Pre-Solicitation Notice with an open date of 2025-03-25 and a close date of 2026-02-28; documentation and attachments are available on the buyer-managed OregonBuys detail page.
Posted Date
Mar 25, 2025
Due Date
Feb 28, 2026
Release: Mar 25, 2025
Close: Feb 28, 2026
The Oregon Department of Transportation is seeking a Technology Consultant to assist with system engineering and to advise the agency on functionality and operation of a Commercial Vehicle Registration (CVR) system. The posting is listed as a Pre-Solicitation Notice with an open date of 2025-03-25 and a close date of 2026-02-28; documentation and attachments are available on the buyer-managed OregonBuys detail page.
AvailableThis is a pre-solicitation notice for remediation services under the Formally Utilized Sites Remedial Action Program (FUSRAP) to remediate the Shallow Land Disposal Area (SLDA). The US Army Corps of Engineers (Buffalo District) anticipates a C-type hybrid contract (cost-reimbursable plus firm-fixed price line items) with a performance period up to ten years and NAICS 562910 (Remediation Services). The solicitation and any amendments will be released electronically through the DoD PIEE solicitation module (accessible via SAM) and the procurement will be full-and-open using a best-value approach; a site visit will be announced when the official solicitation is issued.
Posted Date
Dec 1, 2025
Due Date
Jan 1, 2026
Release: Dec 1, 2025
Close: Jan 1, 2026
This is a pre-solicitation notice for remediation services under the Formally Utilized Sites Remedial Action Program (FUSRAP) to remediate the Shallow Land Disposal Area (SLDA). The US Army Corps of Engineers (Buffalo District) anticipates a C-type hybrid contract (cost-reimbursable plus firm-fixed price line items) with a performance period up to ten years and NAICS 562910 (Remediation Services). The solicitation and any amendments will be released electronically through the DoD PIEE solicitation module (accessible via SAM) and the procurement will be full-and-open using a best-value approach; a site visit will be announced when the official solicitation is issued.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis