Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes clearing and grubbing, vibration monitoring, demolish existing facilities, relocate mailbox, remove and replace ace and vine sign, remove and replace pet hospital sign, closure structure #1, #2, #3, inspection trench excavation and backfill, excavation, earthen backfill (f), floodwall - concrete t-wall footing (f), floodwall -concrete t-wall (f), floodwall - sheet pile wall (f), chain link fence (6 foot, 3 strand barbed wire, vinyl slats), wood and wire divider fence (6-ft), 3-ft pedestrian safety railing, 4-ft pedestrian safety railing, o&m chain link fence gate, wall street waterline modifications, wall street sewerline modifications, lincoln avenue waterline modifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bypass channel north project.
Posted Date
Mar 31, 2025
Due Date
Feb 4, 2026
Release: Mar 31, 2025
Close: Feb 4, 2026
Bypass channel north project.
AvailableProject generally consists of water pollution control, traffic control, and removal of existing facilities within the Mission Creek Channel and adjoining parcels, including demolition of existing bridge and sheet pile transition channel walls (Haley and Gutierrez Street bridges). Work includes installation of approximately 882 linear feet of soldier pile wall using 30/36-inch cast-in-drilled-hole piles; earthwork; construction of rock-slope protection banks and in-stream rock features; protection of existing facilities and utilities, landscape plantings; and restoration of improvements on adjoining private parcels.
Posted Date
Nov 27, 2025
Due Date
Jan 7, 2026
Release: Nov 27, 2025
Close: Jan 7, 2026
Project generally consists of water pollution control, traffic control, and removal of existing facilities within the Mission Creek Channel and adjoining parcels, including demolition of existing bridge and sheet pile transition channel walls (Haley and Gutierrez Street bridges). Work includes installation of approximately 882 linear feet of soldier pile wall using 30/36-inch cast-in-drilled-hole piles; earthwork; construction of rock-slope protection banks and in-stream rock features; protection of existing facilities and utilities, landscape plantings; and restoration of improvements on adjoining private parcels.
Provide flood risk management project, reach 4 phase 1 river floodwall and pump station.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Provide flood risk management project, reach 4 phase 1 river floodwall and pump station.
AvailableNevada State University (NSU) is seeking a qualified architectural and engineering firm to provide professional services for design of an armored channel/berm system, associated drainage facilities, and a mass grading plan to provide 100-year storm event flood protection for the campus. The scope includes environmental assessments, geotechnical investigations, hydrologic and hydraulic drainage analysis, berm and mass grading design, and preparation of construction bid documents, with coordination required with City, County, and State authorities. The selected firm must have experience in high-liability design work, subsurface investigations, drainage channel design in arid environments, and delivery methods including General Construction and CMAR.
Posted Date
Nov 21, 2025
Due Date
Feb 6, 2026
Release: Nov 21, 2025
Close: Feb 6, 2026
Nevada State University (NSU) is seeking a qualified architectural and engineering firm to provide professional services for design of an armored channel/berm system, associated drainage facilities, and a mass grading plan to provide 100-year storm event flood protection for the campus. The scope includes environmental assessments, geotechnical investigations, hydrologic and hydraulic drainage analysis, berm and mass grading design, and preparation of construction bid documents, with coordination required with City, County, and State authorities. The selected firm must have experience in high-liability design work, subsurface investigations, drainage channel design in arid environments, and delivery methods including General Construction and CMAR.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis