Neversink Tank Rehabilitation RFP
Posted
Nov 24, 2026
Jan 6, 2027
Rehabilitation of the 500,000 gallon steel ground tank, Neversink Water Storage Tank, within Township Work includes: Blasting and full painting of the interior, exterior of the tank and the valve vault piping. Grout and install sealant at the base plate, replace internal overflow with an external overflow, replace shell ladder and include with cable safety climb and ladder guard. Install handrails, and stairs on the roof of the tank. Install 4" kickplate kick plate on existing handrail on the side of the roof, install a self-closing swing gate on the ladder to roof transition. Place flowable fill under settling floor plates, install hinge on shell manhole, install tank mixer, remove CP system, and repair site fence.