Lost Creek Wells Pipeline (Invitation To Bid)
Aug 6, 2026
Closes
Aug 19, 2026
Major components of the project include: installation of 24" diameter hdpe pipe from station 5+00 to station 169+71 more or less plus a 20" hdpe line from sta 600+00 to 625+29. The work includes two major canal crossing, one highway crossing, multiply valve and air re lease valve vaults.