Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Moorhead Public Service
Moorhead Public Service is soliciting bids to supply new 15 kV indoor metalclad switchgear for two substations, including seventeen vacuum circuit breakers for the Northeast Substation and eleven vacuum circuit breakers for the Southeast Substation, plus all associated controls and accessories. The contract covers procurement and delivery of the equipment necessary for reliable operation and control of the two substations. Bids were posted on 2026-04-22 and the response deadline is listed as 2026-06-02.
Posted Date
Apr 22, 2026
Due Date
Jun 2, 2026
Release: Apr 22, 2026
Moorhead Public Service
Close: Jun 2, 2026
Moorhead Public Service is soliciting bids to supply new 15 kV indoor metalclad switchgear for two substations, including seventeen vacuum circuit breakers for the Northeast Substation and eleven vacuum circuit breakers for the Southeast Substation, plus all associated controls and accessories. The contract covers procurement and delivery of the equipment necessary for reliable operation and control of the two substations. Bids were posted on 2026-04-22 and the response deadline is listed as 2026-06-02.
AvailableMoorhead Public Service
2 ea, 115 kV SF6 IPO breakers.
Posted Date
Dec 31, 2025
Due Date
Jan 28, 2026
Release: Dec 31, 2025
Moorhead Public Service
Close: Jan 28, 2026
2 ea, 115 kV SF6 IPO breakers.
Moorhead Public Service
Provide 2026 Water Distribution Pipe and Fitting.
Posted Date
Dec 17, 2025
Due Date
Jan 7, 2026
Release: Dec 17, 2025
Moorhead Public Service
Close: Jan 7, 2026
Provide 2026 Water Distribution Pipe and Fitting.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Moorhead Public Service
The meeting agenda was approved with the addition of item #17 concerning the approval of MPS' 2025, 2026, and 2027 Base Pay Structures. The commission approved several items via the consent agenda, including bills for payment and task orders/approvals for professional services. Specific actions included approving Task Order No. 2025-1 with Sandman Structural Engineers for the redundant Network Operations Center design ($35,000 maximum), approving professional services for a biennial laboratory compliance audit ($3,646), approving specifications for 2025 Water Treatment and Wastewater Treatment Chemicals bids, and approving 2025 payroll vendors, delegates, and memberships. The commission accepted reports on the Advanced Metering Infrastructure Project and the Cogeneration and Small Power Production Tariff Report for 2025. The final 2025 budgets and rates were approved, showing an overall 2.0 percent electric rate increase and a 5.5 percent water rate increase. An executive session was held to discuss labor negotiation strategies with IBEW, Local 1426, resulting in a motion to approve the Labor Agreement contingent on ratification and legal review. Finally, the 2025, 2026, and 2027 Base Pay Structures were approved.
Key discussions and actions during the meeting included the approval of the agenda and consent agenda items, which covered the approval of previous minutes from September 17, 2024, and bills for payment. Major approvals included an agreement with USI Consulting Group for GASB 75 compliance and the annual agreement with The Salvation Army for the 2024/2025 HeatShare Program. Reports covered staff relocation from City Hall and updates on grid reliability, MPS involvement in the Red River Water Festival, and staff assistance following Hurricane Milton in Florida. The Commission accepted Report #1 on the proposed 2025 Budget, which recommends a 2 percent overall increase for electric rates and a 4 percent overall increase for water rates. The Commission also accepted the report on the review of Electric Service Extension Surcharges and approved the continuation of 100 percent net-zero carbon power supply through MRES' Bright Energy Choices Program for 2025. Bids were awarded for the 2024/2025 Tree Trimming project to Carr's Tree Service and for the 2025 Electrical Materials to the lowest qualified bidders. Specifications were approved to advertise bids for Contract Hauling and Beneficial Use Services for Lime Residuals from the Water Treatment Plant. Task Order No. 10 with Apex Engineering Group, Inc., was approved for 2025 Watermain Improvement Projects engineering services. Public hearings were conducted regarding the proposed 2 percent electric rate increase and the 4 percent water rate increase for 2025, with no customer comments offered during the hearings. Finally, the Commission approved the Summary of Conclusions of the General Manager's Performance Evaluation and approved a two-step compensation increase for the General Manager, along with approving a revised organizational structure and number of personnel for the remainder of 2024 and 2025.
The meeting commenced with the approval of the agenda and the consent agenda, which included routine items such as the approval of the August 6, 2024 minutes and bills for payment. Key actions involved the approval of Task Order No. 2 with Terracon Consultants, Inc., for geotechnical engineering services at the Northeast Substation, and the approval of the revised Exhibit A to the Transmission Operator Procedure with WAPA concerning facility maintenance. Discussions included reminders about due dates for the General Manager's performance review responses. Reports highlighted MPS winning the Tap Water Taste Test contest at the Minnesota State Fair and included updates on the 2024 second quarter Strategic Plan. The Commission awarded the bid for the 2024 Lead Service Line Replacement Pilot Project to Randall's Excavating, Inc., contingent upon final approval from the Minnesota Public Facilities Authority. Finally, the Commission appointed members to the Budget Working Group and set the dates for the water and electric rate hearings for 2025.
The agenda for the Moorhead Public Service Commission meeting includes approval of the agenda and consent agenda items, which cover routine matters such as approving minutes from the August 6, 2024 meeting and bills for payment. Key discussion topics involve reports from the City Council and the General Manager, including updates on the MRES' Smart Energy Squad School Program and regional electric rates. Other substantive items include approving a Task Order with Terracon Consultants, Inc. for Geotechnical Engineering Services at the Northeast Substation, approving a Revised Exhibit A to the Transmission Operator Procedure with WAPA, awarding a bid for the 2024 Lead Service Line Replacement Pilot Project, and reviewing the preliminary 2025 Budget Timetable, appointing a Budget Working Group, and setting dates for Water and Electric Rate Hearings.
The agenda for the meeting included standard administrative items such as approving the agenda and consent agenda, which covered approval of prior minutes and bills for payment. Key discussion items involved reviewing reports from the City Council and General Manager, accepting reports on the MRES' Smart Energy Squad School Program and Regional Electric Rates. Action items included approving a Task Order with Terracon Consultants, Inc., for Geotechnical Engineering Services at Northeast Substation, approving a Revised Exhibit A to the Transmission Operator Procedure with WAPA, awarding the bid for the 2024 Lead Service Line Replacement Pilot Project, and reviewing the preliminary 2025 Budget Timetable, which included appointing a Budget Working Group and setting dates for Water and Electric Rate Hearings. An Executive Session was scheduled if needed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Moorhead Public Service's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge