Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Mni Waste Water Company
Work includes but is not limited to: Replacement of gravity sewer main, and CIPP line existing sewer main based on CCTV inspections, reconnection of sewer service lines to the new sewer main, manhole replacement and renovation, and repair of streets after work has been completed as identified per the plans and specifications.
Posted Date
Jun 5, 2026
Due Date
Jul 7, 2026
Release: Jun 5, 2026
Mni Waste Water Company
Close: Jul 7, 2026
Work includes but is not limited to: Replacement of gravity sewer main, and CIPP line existing sewer main based on CCTV inspections, reconnection of sewer service lines to the new sewer main, manhole replacement and renovation, and repair of streets after work has been completed as identified per the plans and specifications.
AvailableMni Waste Water Company
Approx. 9,120 LF of 6" dia. Buried PVC pipe. Approx. 27,550 LF of 4" dia. Buried PVC pipe. Approx. 26,950 LF of 2" dia. Buried PVC pipe; approx. 120 LF of 12" dia. Horizontal directional drilled PVC encasement pipe; approx. 190 LF of 10" dia. Horizontal directional drilled PVC encasement pipe; approx. 880 LF of 6" dia. Horizontal directional drilled PVC encasement pipe; approx. 65,520 LF of tracer wire and associated locating and testing system; miscellaneous appurtenances including isolation gate valves, automatic air release valves, direct bury gate valves, blow-off assemblies, service taps, curb stops, and meter pits; temporary and permanent erosion control, fencing, reclamation and seeding; traffic control and haul road maintenance during construction; pipeline cleaning, hydrostatic pressure testing, flushing, disinfection and commissioning; and clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction.
Posted Date
Apr 2, 2026
Due Date
Apr 28, 2026
Release: Apr 2, 2026
Mni Waste Water Company
Close: Apr 28, 2026
Approx. 9,120 LF of 6" dia. Buried PVC pipe. Approx. 27,550 LF of 4" dia. Buried PVC pipe. Approx. 26,950 LF of 2" dia. Buried PVC pipe; approx. 120 LF of 12" dia. Horizontal directional drilled PVC encasement pipe; approx. 190 LF of 10" dia. Horizontal directional drilled PVC encasement pipe; approx. 880 LF of 6" dia. Horizontal directional drilled PVC encasement pipe; approx. 65,520 LF of tracer wire and associated locating and testing system; miscellaneous appurtenances including isolation gate valves, automatic air release valves, direct bury gate valves, blow-off assemblies, service taps, curb stops, and meter pits; temporary and permanent erosion control, fencing, reclamation and seeding; traffic control and haul road maintenance during construction; pipeline cleaning, hydrostatic pressure testing, flushing, disinfection and commissioning; and clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction.
Mni Waste Water Company
Grading, Rock riprap and erosion control for landslide mitigation.
Posted Date
Dec 5, 2024
Due Date
Dec 17, 2024
Release: Dec 5, 2024
Mni Waste Water Company
Close: Dec 17, 2024
Grading, Rock riprap and erosion control for landslide mitigation.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge