Summary
Approx. 9,120 LF of 6" dia. Buried PVC pipe. Approx. 27,550 LF of 4" dia. Buried PVC pipe. Approx. 26,950 LF of 2" dia. Buried PVC pipe; approx. 120 LF of 12" dia. Horizontal directional drilled PVC encasement pipe; approx. 190 LF of 10" dia. Horizontal directional drilled PVC encasement pipe; approx. 880 LF of 6" dia. Horizontal directional drilled PVC encasement pipe; approx. 65,520 LF of tracer wire and associated locating and testing system; miscellaneous appurtenances including isolation gate valves, automatic air release valves, direct bury gate valves, blow-off assemblies, service taps, curb stops, and meter pits; temporary and permanent erosion control, fencing, reclamation and seeding; traffic control and haul road maintenance during construction; pipeline cleaning, hydrostatic pressure testing, flushing, disinfection and commissioning; and clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction.