Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Millbury Housing Authority
The Project consists of Selective renovations of showers, including new shower finishes, drains and valves. Selective renovations of water damaged areas.
Posted Date
Feb 11, 2026
Due Date
Mar 12, 2026
Release: Feb 11, 2026
Millbury Housing Authority
Close: Mar 12, 2026
The Project consists of Selective renovations of showers, including new shower finishes, drains and valves. Selective renovations of water damaged areas.
AvailableMillbury Housing Authority
The project consists of furnishing all labor, tools, materials, and equipment necessary for the replacement of the approx. 380 feet of existing water services, 200 feet of underground roof drains, 60 feet of storm drain pipes, 300 feet of sewer pipes as well as two catch basins and three sewer manholes within the housing authority property. Surface improvements include replacement of hot mix asphalt sidewalks, parking lot and driveways. Finally, new compliant signage and pavement markings will be installed across the project site. Also included is all work associated with the repair of areas impacted by the work under this Contract, minor modification to buildings, and traffic, both pedestrian and vehicular, control measures.
Posted Date
Aug 10, 2025
Due Date
Aug 27, 2025
Release: Aug 10, 2025
Millbury Housing Authority
Close: Aug 27, 2025
The project consists of furnishing all labor, tools, materials, and equipment necessary for the replacement of the approx. 380 feet of existing water services, 200 feet of underground roof drains, 60 feet of storm drain pipes, 300 feet of sewer pipes as well as two catch basins and three sewer manholes within the housing authority property. Surface improvements include replacement of hot mix asphalt sidewalks, parking lot and driveways. Finally, new compliant signage and pavement markings will be installed across the project site. Also included is all work associated with the repair of areas impacted by the work under this Contract, minor modification to buildings, and traffic, both pedestrian and vehicular, control measures.
Millbury Housing Authority
The project consists of furnishing all labor, tools, materials, and equipment necessary for the replacement of the approx. 380 feet of existing water services, 200 feet of underground roof drains, 60 feet of storm drain pipes, 300 feet of sewer pipes as well as two catch basins and three sewer manholes within the housing authority property. Surface improvements include replacement of hot mix asphalt sidewalks, parking lot and driveways. Finally, new compliant signage and pavement markings will be installed across the project site.
Posted Date
Aug 6, 2025
Due Date
Aug 27, 2025
Release: Aug 6, 2025
Millbury Housing Authority
Close: Aug 27, 2025
The project consists of furnishing all labor, tools, materials, and equipment necessary for the replacement of the approx. 380 feet of existing water services, 200 feet of underground roof drains, 60 feet of storm drain pipes, 300 feet of sewer pipes as well as two catch basins and three sewer manholes within the housing authority property. Surface improvements include replacement of hot mix asphalt sidewalks, parking lot and driveways. Finally, new compliant signage and pavement markings will be installed across the project site.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Millbury Housing Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Millbury Housing Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database