Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Midwest City Memorial Hospital Authority
Demolition and clearing of the for professional office building.
Posted Date
Jun 3, 2026
Due Date
Jun 25, 2026
Release: Jun 3, 2026
Midwest City Memorial Hospital Authority
Close: Jun 25, 2026
Demolition and clearing of the for professional office building.
AvailableMidwest City Memorial Hospital Authority
Work includes concrete forming and accessories; concrete unit masonry; structural steel framing; rough carpentry; shop-fabricated wood trusses; thermal insulation; hollow metal doors and frames; linear metal ceilings; dimensional letter signage; fire protection specialties; basic plumbing requirements; sanitary waste and vent piping; hanger and supports for hvac piping and equipment; duct insulation; cleaning, inspection, and testing of electrical equipment; hangers and supports for electrical systems; site clearing; concrete paving & curb; precast concrete unit paving. See attached file.
Posted Date
Mar 23, 2026
Due Date
Apr 8, 2026
Release: Mar 23, 2026
Midwest City Memorial Hospital Authority
Close: Apr 8, 2026
Work includes concrete forming and accessories; concrete unit masonry; structural steel framing; rough carpentry; shop-fabricated wood trusses; thermal insulation; hollow metal doors and frames; linear metal ceilings; dimensional letter signage; fire protection specialties; basic plumbing requirements; sanitary waste and vent piping; hanger and supports for hvac piping and equipment; duct insulation; cleaning, inspection, and testing of electrical equipment; hangers and supports for electrical systems; site clearing; concrete paving & curb; precast concrete unit paving. See attached file.
Midwest City Memorial Hospital Authority
Redevelopment of the approx. 3.707-acre parcel.
Posted Date
Mar 11, 2026
Due Date
Apr 14, 2026
Release: Mar 11, 2026
Midwest City Memorial Hospital Authority
Close: Apr 14, 2026
Redevelopment of the approx. 3.707-acre parcel.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge