ECR 130 Phase 1 (Request for Proposal)
Posted
Sep 8, 2026
Oct 15, 2026
Provide reconstruction of west county road. 1,131 LF sawcut existing asphalt and concrete (full depth); 923 CY asphalt excavation - 1.0 inch depth (average); 923 CY asphalt haul off; 14,786 CY earthwork; 14,786 CY haul off; 43,064 SY subgrade preparation (roadway). See attached file.
