Hillside Avenue Drainage Improvements
Jul 29, 2026
Closes
Aug 19, 2026
Work includes drainage improvements. The existing infrastructure is insufficient and residents downhill of Hillside Avenue have had reoccurring flooding issues. This project proposes installing new stormwater pipes and inlets and connecting them to the existing stormwater system, as well as re-grading the roadway to allow for more efficient drainage flow.