Lashley Hill Road (Twp Road 716) Slope Repair
Posted
Sep 12, 2026
Sep 21, 2026
Project work includes: Groundwater/Stormwater management is the responsibility of the Contractor and will include: Properly restricting the accumulation of any water within excavated areas; and Containerizing, characterizing (by certified laboratory analytical testing), and disposing of any water that accumulates within excavation areas.