Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
MCC Chicago
Replace condensate tank system. Construction requirement for replacing the condensate tank system. The project consists of furnishing all equipment, materials, and labor for the complete replacement of the condensate system. See attached file.
Posted Date
Mar 13, 2026
Due Date
Apr 27, 2026
Release: Mar 13, 2026
MCC Chicago
Close: Apr 27, 2026
Replace condensate tank system. Construction requirement for replacing the condensate tank system. The project consists of furnishing all equipment, materials, and labor for the complete replacement of the condensate system. See attached file.
AvailableMCC Chicago
Repair glycol loop exchanger. 1 JB. The project consists of furnishing all equipment, materials, and labor for the complete repair to the existing Hybrid Fluid Cooler (Model NXF-0603N-CS2TT -J2 / Nexus TM Modular Hybrid Cooler), 2 Pumps with VFDs, and pipework installed throughout the 27-story high-rise to feed 14 heat pump cooling units.
Posted Date
Mar 13, 2026
Due Date
Apr 27, 2026
Release: Mar 13, 2026
MCC Chicago
Close: Apr 27, 2026
Repair glycol loop exchanger. 1 JB. The project consists of furnishing all equipment, materials, and labor for the complete repair to the existing Hybrid Fluid Cooler (Model NXF-0603N-CS2TT -J2 / Nexus TM Modular Hybrid Cooler), 2 Pumps with VFDs, and pipework installed throughout the 27-story high-rise to feed 14 heat pump cooling units.
AvailableMCC Chicago
Replace gas boosters. The project consists of furnishing all equipment, materials, and labor for the complete replacement of the Gas Boosters. MCC Chicago has 2 (TWO) existing Hermetic Natural Gas Boosters installed in the late 1980's to boost gas pressure up to 1 PSI (27 WIC). The 2 boosters work in tandem and rotate on a manual schedule based on hours of operation. These boosters will be replaced, new isolation valves, new VFDs on each booster modulate on gas demand, and new electrical supply for each booster. New VFDs will be integrated into the existing BAS. See attached file.
Posted Date
Mar 13, 2026
Due Date
Apr 27, 2026
Release: Mar 13, 2026
MCC Chicago
Close: Apr 27, 2026
Replace gas boosters. The project consists of furnishing all equipment, materials, and labor for the complete replacement of the Gas Boosters. MCC Chicago has 2 (TWO) existing Hermetic Natural Gas Boosters installed in the late 1980's to boost gas pressure up to 1 PSI (27 WIC). The 2 boosters work in tandem and rotate on a manual schedule based on hours of operation. These boosters will be replaced, new isolation valves, new VFDs on each booster modulate on gas demand, and new electrical supply for each booster. New VFDs will be integrated into the existing BAS. See attached file.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
MCC Chicago
NATURAL GAS USAGE
Effective Date
Dec 8, 2025
Expires
Effective: Dec 8, 2025
MCC Chicago
Expires:
NATURAL GAS USAGE
MCC Chicago
MAILROOM COPIER
Effective Date
Nov 1, 2024
Expires
Effective: Nov 1, 2024
MCC Chicago
Expires:
MAILROOM COPIER
AvailableMCC Chicago
TO PROVIDE FORENSIC PSYCHIATRIST SERVICES FOR MCC CHICAGO, IL FOR 5 PERFORMANCE PERIODS AND 6 MONTH OPTION PERIOD.
Effective Date
Jun 1, 2023
Expires
Effective: Jun 1, 2023
MCC Chicago
Expires:
TO PROVIDE FORENSIC PSYCHIATRIST SERVICES FOR MCC CHICAGO, IL FOR 5 PERFORMANCE PERIODS AND 6 MONTH OPTION PERIOD.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Track MCC Chicago's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database