Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
McAlester Army Ammunition Plant
The Department of the Army's Mission Installation Contracting Command at Fort Drum, NY is issuing a Combined Synopsis/Solicitation on behalf of the McAlester Army Ammunition Plant in Oklahoma for the procurement of three 65-foot lighting masts. This is a Total Small Business Set-Aside under NAICS 332323 (Ornamental and Architectural Metal Work Manufacturing), with the solicitation originally published on June 29, 2026 and amended on July 10, 2026 to increase the quantity from two to three units. Quotes are due by July 17, 2026 at 7:00 AM CDT, with delivery required to the McAlester Army Ammunition Plant at 1 C-Tree Rd, McAlester, OK 74501.
Posted Date
Jun 29, 2026
Due Date
Jul 17, 2026
Release: Jun 29, 2026
McAlester Army Ammunition Plant
Close: Jul 17, 2026
The Department of the Army's Mission Installation Contracting Command at Fort Drum, NY is issuing a Combined Synopsis/Solicitation on behalf of the McAlester Army Ammunition Plant in Oklahoma for the procurement of three 65-foot lighting masts. This is a Total Small Business Set-Aside under NAICS 332323 (Ornamental and Architectural Metal Work Manufacturing), with the solicitation originally published on June 29, 2026 and amended on July 10, 2026 to increase the quantity from two to three units. Quotes are due by July 17, 2026 at 7:00 AM CDT, with delivery required to the McAlester Army Ammunition Plant at 1 C-Tree Rd, McAlester, OK 74501.
AvailableMcAlester Army Ammunition Plant
The U.S. Department of the Army, through the W390 McAlester Army Ammunition Plant in McAlester, Oklahoma, has issued a Combined Synopsis/Solicitation (Notice ID W519TC26Q3178) seeking a qualified contractor to perform a full retube repair on a Cleaver-Brooks CB200-250-150ST boiler at the McAlester Army Ammunition Plant. The contractor must mobilize a certified boiler mechanic, perform cutting and welding, install replacement fire tubes (provided by the government), test the boiler, and complete all work within 30 calendar days of mobilization while complying with OSHA guidelines and USACE EM 385-1-1 safety regulations. This is a Total Small Business Set-Aside (NAICS 811310, PSC 4710) under the Simplified Acquisition Threshold with quotes due on July 7, 2026 at 1:00 pm CDT.
Posted Date
Jun 30, 2026
Due Date
Jul 7, 2026
Release: Jun 30, 2026
McAlester Army Ammunition Plant
Close: Jul 7, 2026
The U.S. Department of the Army, through the W390 McAlester Army Ammunition Plant in McAlester, Oklahoma, has issued a Combined Synopsis/Solicitation (Notice ID W519TC26Q3178) seeking a qualified contractor to perform a full retube repair on a Cleaver-Brooks CB200-250-150ST boiler at the McAlester Army Ammunition Plant. The contractor must mobilize a certified boiler mechanic, perform cutting and welding, install replacement fire tubes (provided by the government), test the boiler, and complete all work within 30 calendar days of mobilization while complying with OSHA guidelines and USACE EM 385-1-1 safety regulations. This is a Total Small Business Set-Aside (NAICS 811310, PSC 4710) under the Simplified Acquisition Threshold with quotes due on July 7, 2026 at 1:00 pm CDT.
McAlester Army Ammunition Plant
The McAlester Army Ammunition Plant (MCAAP) has a requirement to replace the fire tubes on Boiler No. 1 and Boiler No. 2 located in Building 165. A severe leak in an isolated fire tube has rendered the units inoperable. The contractor shall mobilize a certified boiler mechanic to perform all necessary labor, cutting, welding, installation, and testing required to return both boilers to safe operational status.
Posted Date
Jun 25, 2026
Due Date
Jun 29, 2026
Release: Jun 25, 2026
McAlester Army Ammunition Plant
Close: Jun 29, 2026
The McAlester Army Ammunition Plant (MCAAP) has a requirement to replace the fire tubes on Boiler No. 1 and Boiler No. 2 located in Building 165. A severe leak in an isolated fire tube has rendered the units inoperable. The contractor shall mobilize a certified boiler mechanic to perform all necessary labor, cutting, welding, installation, and testing required to return both boilers to safe operational status.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
McAlester Army Ammunition Plant
FSC: 9670 NAME: PLATE,STEEL PART NUMBER: PLATESTEEL
Effective Date
Mar 21, 2022
Expires
Effective: Mar 21, 2022
McAlester Army Ammunition Plant
Expires:
FSC: 9670 NAME: PLATE,STEEL PART NUMBER: PLATESTEEL
McAlester Army Ammunition Plant
LIGHT TASK ESD GLOVE SZ: 7,8,9&10
Effective Date
Jul 22, 2020
Expires
Effective: Jul 22, 2020
McAlester Army Ammunition Plant
Expires:
LIGHT TASK ESD GLOVE SZ: 7,8,9&10
McAlester Army Ammunition Plant
COLOR LASERJET WITH SMART CARD
Effective Date
Mar 28, 2022
Expires
Effective: Mar 28, 2022
McAlester Army Ammunition Plant
Expires:
COLOR LASERJET WITH SMART CARD
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge