Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Mass Transit Authority (Flint And Genesee County)
The Mass Transportation Authority of Flint (MTA Flint) is soliciting bids under IFB 2026-07 for the purchase of bulk Liquefied Petroleum Gas (LPG), also known as propane. Bids must be submitted electronically through the MITN portal by the closing date of June 24, 2026, at 3:00 PM EDT. No budget estimate is available at this time.
Posted Date
Jun 8, 2026
Due Date
Jun 24, 2026
Release: Jun 8, 2026
Mass Transit Authority (Flint And Genesee County)
Close: Jun 24, 2026
The Mass Transportation Authority of Flint (MTA Flint) is soliciting bids under IFB 2026-07 for the purchase of bulk Liquefied Petroleum Gas (LPG), also known as propane. Bids must be submitted electronically through the MITN portal by the closing date of June 24, 2026, at 3:00 PM EDT. No budget estimate is available at this time.
AvailableMass Transit Authority (Flint And Genesee County)
Purchase of bulk liquid petroleum gasoline.
Posted Date
Jun 11, 2026
Due Date
Jun 24, 2026
Release: Jun 11, 2026
Mass Transit Authority (Flint And Genesee County)
Close: Jun 24, 2026
Purchase of bulk liquid petroleum gasoline.
AvailableMass Transit Authority (Flint And Genesee County)
Construction of memorial park. Phase 1 will focus on the installation of the Gazebo, Brick Pavers, construction of a sidewalk path to the Gazebo (8' wide, 1,1/2" Top HMA-4E, Bond Coat, 1 1/2: Leveling HMA-3E, 6" 21AA Limestone Compacted to 98% Max Density) 2 park benches, nearby landscaping shrubs and decorative plants (see Exhibit A & B). Phase 2 will consist of construction of a winding walking path throughout the MTA Memorial Park Site (8' wide, 1,1/2" Top HMA-4E, Bond Coat, 1 1/2: Leveling HMA-3E, 6" 21AA Limestone Compacted to 98% Max Density) 6 park benches, trees, shrubs and 6' Tall Galvanized Chain-link Fence with top Rail and Bottom Wire; 8' Gate (gate size subject to change for service and emergency vehicle access considerations), 2 ADA Compliant Gates and Concrete Footings.
Posted Date
May 21, 2026
Due Date
Jun 17, 2026
Release: May 21, 2026
Mass Transit Authority (Flint And Genesee County)
Close: Jun 17, 2026
Construction of memorial park. Phase 1 will focus on the installation of the Gazebo, Brick Pavers, construction of a sidewalk path to the Gazebo (8' wide, 1,1/2" Top HMA-4E, Bond Coat, 1 1/2: Leveling HMA-3E, 6" 21AA Limestone Compacted to 98% Max Density) 2 park benches, nearby landscaping shrubs and decorative plants (see Exhibit A & B). Phase 2 will consist of construction of a winding walking path throughout the MTA Memorial Park Site (8' wide, 1,1/2" Top HMA-4E, Bond Coat, 1 1/2: Leveling HMA-3E, 6" 21AA Limestone Compacted to 98% Max Density) 6 park benches, trees, shrubs and 6' Tall Galvanized Chain-link Fence with top Rail and Bottom Wire; 8' Gate (gate size subject to change for service and emergency vehicle access considerations), 2 ADA Compliant Gates and Concrete Footings.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Mass Transit Authority (Flint And Genesee County)
The council discussed the ADA certification process, confirmed that future meeting locations will remain at the Vocational Independence Program, and received an update on the ADA application process. A significant portion of the meeting was dedicated to the new MTA call system and software, which has already resulted in a notable reduction in denied rides. The status report provided updates on passenger statistics, ADA ride data, the launch of the Trip Planner App and the Davison Trolley, and plans for the new micro-transit system, Genesee Connect, along with information regarding the upcoming MTA millage on the ballot.
The council discussed various operational updates including the ADA certification process, the implementation of new AI-driven VIA software for the MTA, and the status of the member contact list. Reports were provided on ridership statistics, including disability-related data and trip cancellation rates. Plans were announced regarding the MTA trip planner app, new service partnerships, upcoming millage renewal, and strategic planning initiatives. Additionally, members shared information regarding community events, organization fundraisers, and regional master planning efforts.
The agenda for the February 11th meeting included discussion of the ADA Application and Certification process, review of 2026 meeting locations, and updates on the New Call System and software for MTA. New business covered future meeting locations and reviewing member contact information. A status report service report was also scheduled.
This Strategic Plan outlines the roadmap for the Mass Transportation Authority (MTA) from 2016 to 2026, aiming to build a robust public transportation system for Genesee County residents. The plan is built upon a vision of transformational leadership in providing innovative, accessible, and sustainable public transportation services. It focuses on eight key goals: ensuring accountability and sustainability; cultivating a qualified workforce; maintaining fleet and facilities; strengthening and expanding services; delivering total quality customer service; enhancing strategic partnerships; providing leadership on initiatives; and maximizing technology utilization.
The agenda includes discussion of the ADA Certification process, membership vacancies, by-law review and approval, 2026 meeting location sign up, ADA application, a new call system and software for MTA, FY26 Specialized Services Allocations review, vehicle leases, a loose vehicle lease application, and a vehicle accessibility plan update. Also, the status report service report from Ed Burger, MTA public comment, and member comment.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Mass Transit Authority (Flint And Genesee County)'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief Operating Officer of Communications and External Affairs
Premium
Access the largest public sector contact database
© 2026 Starbridge