Canal View Mainline Improvements - Water System Distribution Improvements RFP
Aug 5, 2026
Closes
Aug 21, 2026
Work on Highway 101 ROW includes: Abandon approx. 760 LF of 2.5" PVC water main; construct approx 760 LF of 4" HDPE water main via trenchless methods; 40' of 12" steel casing and 4" carrier pipe; install valves, blowoffs, service lines, meters, connection to onsite piping; testing; restore surface; traffic control.