Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Mason Conservation District
Construction of 9, pile supported and bank ballasted LWD (Large Woody Debris) Habitat/Complexity structures, 1 bank ballasted back channel ELJ (Engineered Log Jam) and excavation of an approx. 160 LF bank channel. Spoils from back channel excavation will be hauled to, spread and compacted at an on-site upland spoils area. Imported streambed sediments will be places within the back channel. This work will also require stabilizing all areas disturbed by construction activities with hydroseed as well as resurfacing approx. 2,300 LF of W. Winter Creek Road.
Posted Date
Mar 4, 2026
Due Date
Apr 15, 2026
Release: Mar 4, 2026
Mason Conservation District
Close: Apr 15, 2026
Construction of 9, pile supported and bank ballasted LWD (Large Woody Debris) Habitat/Complexity structures, 1 bank ballasted back channel ELJ (Engineered Log Jam) and excavation of an approx. 160 LF bank channel. Spoils from back channel excavation will be hauled to, spread and compacted at an on-site upland spoils area. Imported streambed sediments will be places within the back channel. This work will also require stabilizing all areas disturbed by construction activities with hydroseed as well as resurfacing approx. 2,300 LF of W. Winter Creek Road.
AvailableMason Conservation District
Qualified parties to assist with the restoration of beach and estuarine habitat processes on Case Inlet in Mason County, Washington. The project site is in Washington Tidal Reference Area 2 (Olympia) on Highway 302 in Victor. Restoration work on this project includes: removing approx. 96-FT of rock bulkhead, excavating and grading a more natural beach slope and storm berm, removing 2 metal culverts and associated concrete lined channel, realigning a small stream back into its historic alignment, constructing an approximately 75-foot earthen berm, installation of 6 large logs with rootwads and anchoring on the beach, and other work.
Posted Date
Feb 19, 2026
Due Date
Apr 14, 2026
Release: Feb 19, 2026
Mason Conservation District
Close: Apr 14, 2026
Qualified parties to assist with the restoration of beach and estuarine habitat processes on Case Inlet in Mason County, Washington. The project site is in Washington Tidal Reference Area 2 (Olympia) on Highway 302 in Victor. Restoration work on this project includes: removing approx. 96-FT of rock bulkhead, excavating and grading a more natural beach slope and storm berm, removing 2 metal culverts and associated concrete lined channel, realigning a small stream back into its historic alignment, constructing an approximately 75-foot earthen berm, installation of 6 large logs with rootwads and anchoring on the beach, and other work.
AvailableMason Conservation District
Helicopter transport and placement of 202 habitat logs.
Posted Date
Feb 5, 2026
Due Date
Mar 19, 2026
Release: Feb 5, 2026
Mason Conservation District
Close: Mar 19, 2026
Helicopter transport and placement of 202 habitat logs.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Mason Conservation District
The board reviewed and accepted the financial report for December 2025. Updates were provided on legislative activity, including House Bill 2499 concerning conservation district elections, and anticipated budget cuts. Staff reported on moving projects towards construction, year-end finance activities, and efforts to fill the Shore Friendly Coordinator position. New business included the approval of a hedgerow planting project (SIA-01-26 SH) costing $10,000 with 90% cost share. The board authorized the chair to sign an agreement with the Skokomish Tribe for grant funds to support the Upper South Fork Phase 6 construction project. The construction contract for the Skokomish SF LWD project was awarded to Quigg Bros., Inc. for $2,336,925.39. The 2026 Annual Budget and Salary Schedule, which includes a 2.8% COLA increase and a two-step increase for the Executive Director, was approved, budgeting total revenue at $12,123,039.46 and expenditures at $11,903,583.76. Finally, the board approved putting a 2003 Chevy Silverado 1500 up for surplus.
The Board of Supervisors meeting included a review and acceptance of the November 2025 financial report. Program updates covered ongoing nonpoint source assessments and outreach process evaluations by ECY, staff catching up on assistance requests during the holidays, workshops, and planning for a clean water event in January. Staff is also preparing to fill the Shore Friendly Coordinator position and planning maintenance in a fenced area. New business involved the approval of two VSP cost share applications for high tunnel systems, one for South Sound and one for Hood Canal. The Board approved a subaward agreement of $185,431 from the Hood Canal Coordinating Council to continue technical assistance through September 2027. Additionally, Rhonda Nydegger was appointed as the election supervisor, and Resolution 2025-4 was approved to set the 2026 Board of Supervisors election date for March 24, 2026. Finally, the Board authorized signing an agreement with the US Forest Service for the Upper South Fork Skokomish Large Wood Enhancement, Phase VI project.
The meeting included updates from WSCC, WACD, NRCS, and ECY. Staff provided updates on maintenance, site preparation, farm team activities, Skokomish projects, digital archiving, and finance. The District was awarded the Northwest Area Conservation District of the Year by SCC. New business included discussions and approvals for SCC VSP and Shellfish Cost Share Amendments, SCC Natural Resources Investments Addendum, WSDA Resiliency Grant Agreement, SCC Grant Addendum 26-12-CH, RCO Grant 25-1272 Grant Amendment, Decker Creek Project Professional Services Contract, HCSEG Subaward Agreement, RCO Grant 24-1097 Grant Agreement, Skokomish Tribe Professional Services Agreement, RCO Grant 25-1008 Agreement, RCO Grant 25-1007 Agreement, SCC Authorized Signatures Form, and an updated Purchasing Manual.
The meeting included updates from WSCC and WACD. The board discussed the RCO Project R24-1203, Gosnell Creek LWD and Fish Passage grant, and approved Board Resolution 2025-1 for RCO pertaining to multiple projects. The Russell Family Foundation grant award was approved for outdoor field education. The board also approved the ILA addendum with Mason County Public Works for the Lynch Creek Restoration. Several cost share applications were approved, and the contract amendment with Anchor QEA for the Skokomish Valley project was discussed and approved.
The meeting included updates from WSCC, NRCS, and ECY. Staff provided updates on upcoming trainings, forestry programs, lead entity activity, bulkhead removal projects, knotweed treatment, and updates to the Purchasing Manual and Employee Handbook. The Board discussed and approved accepting a charitable corpus donation from the dissolving HOPE Garden Project. They also approved grant agreements and amendments related to riparian restoration, salmon habitat protection, and various funding programs. Additionally, they discussed health insurance renewal, a log harvest and haul contract, and agreements related to technical support, shore-friendly initiatives, forest health, sustainable farms, and shellfish programs.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Mason Conservation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database