Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Marion Utilities's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Director for Operations & Maintenance
Accounting/Billing Coordinator
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Marion Utilities
The work consists of the construction of approx. 897 F of 12?'" SDR 35 PVC Sewer Pipe, 99 F of 6" C 900 Sewer Pipe, 4- 48-" Sanitary Manholes, and 38 F of 15" corrugated metal culvert pipe; and all appurtenances necessary to direct the flow of wastewater from the lime lagoon overflow structures to the existing sanitary sewer network along Meridian Street.Proposals shall be properly and completely executed on the standard Proposal Form obtainable from the office of the Engineer, with fully executed Non-collusion Affidavit required by the statutes of the State of Indiana. Form 96, Contractors Bid for Public Works, shall accompany all bids as prescribed by the Indiana State Board of Accounts.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Marion Utilities
Close: Jan 13, 2026
The work consists of the construction of approx. 897 F of 12?'" SDR 35 PVC Sewer Pipe, 99 F of 6" C 900 Sewer Pipe, 4- 48-" Sanitary Manholes, and 38 F of 15" corrugated metal culvert pipe; and all appurtenances necessary to direct the flow of wastewater from the lime lagoon overflow structures to the existing sanitary sewer network along Meridian Street.Proposals shall be properly and completely executed on the standard Proposal Form obtainable from the office of the Engineer, with fully executed Non-collusion Affidavit required by the statutes of the State of Indiana. Form 96, Contractors Bid for Public Works, shall accompany all bids as prescribed by the Indiana State Board of Accounts.
AvailableMarion Utilities
Lime Approx 2,500 tons of High Calcium Quicklime(3/8? ?" 0? granular), via blower, trucks equipped with adjustable flow bottom-drop hoppers.
Posted Date
Oct 11, 2025
Due Date
Oct 29, 2025
Release: Oct 11, 2025
Marion Utilities
Close: Oct 29, 2025
Lime Approx 2,500 tons of High Calcium Quicklime(3/8? ?" 0? granular), via blower, trucks equipped with adjustable flow bottom-drop hoppers.
Marion Utilities
Project includes but is not limited to the installation of a new 1.7 MG storage tank, a new diversion structure, and approximately 201 feet of a thirty-six (36) inch diameter sanitary sewer. The project also includes a 0.9 MGD lift station and a 6" diameter force main storm sewer relocation, water main relocation, and site improvements.
Posted Date
Sep 24, 2025
Due Date
Oct 30, 2025
Release: Sep 24, 2025
Marion Utilities
Close: Oct 30, 2025
Project includes but is not limited to the installation of a new 1.7 MG storage tank, a new diversion structure, and approximately 201 feet of a thirty-six (36) inch diameter sanitary sewer. The project also includes a 0.9 MGD lift station and a 6" diameter force main storm sewer relocation, water main relocation, and site improvements.